Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Etp Heavy Chemical
|
| Description |
Supply Of Etp Heavy Chemical In Sugar Mill
|
| Organisation | GM (The Bazpur Co-operative Sugar Factory Ltd.) | State Govt. and UT |
| Tender Id | 2024_BCSFL_71019_1 |
|
Reference Number |
Supply of ETP Heavy Chemical |
| Tender Fee | 354 |
| EMD | 10000 |
| Tender Value | - |
| Place | Bazpur |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=85272 |
| Start Date | March 06, 2024 21:30 |
| End Date |
Expired
20/03/2024
Expired 935 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco -ktps - vii stage - chemical div - procurement of quartz sand for ssf / avg filters at cwtp - quotation called for - regarding.
Tggenco -ktps - vii stage - chemical div - procurement of quartz sand for ssf / avg filters at cwtp - quotation called for - regarding.
Read moreConceptualizing, designing, fabrication and setting up of the 14th edition of india chem 2026 during 22nd to 24th october 2026 at the bombay exhibition centre with the theme- advantage bharat, an emerging global chemical hub
Conceptualizing, designing, fabrication and setting up of the 14th edition of india chem 2026 during 22nd to 24th october 2026 at the bombay exhibition centre with the theme- advantage bharat, an emerging global chemical hub
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreElectrical panel for etp,sodium meta by sulphate,bleaching powder chemical,alum chemical,lime chemi
Read more
Rc for wtp lab,etp lab and process lab chemical/apparatus
Rc for wtp lab,etp lab and process lab chemical/apparatus
Read moreof your Industry type