Tender Details
Particulars | Details |
---|---|
Title |
Tiling Of Rooms And Work Of Children Urinal In The Composite School Pvt. Harunagala 2 Identified Under Operation Kayakalp.
|
Description |
Tiling Of Rooms And Work Of Children Urinal In The Composite School Pvt. Harunagala 2 Identified Under Operation Kayakalp.
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2024_DOLBU_909277_1 |
Reference Number |
694 (1to20)21 /C.E/N.V/2023-24 S.No 7 |
Tender Fee | 118 |
EMD | 2036 |
Tender Value | |
Place | Nagar Nigam Bareilly |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1569246 |
Start Date | March 04, 2024 14:30 |
End Date |
06/03/2024 ( Expired 435 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreDrain and c.c. road construction work in vinayak nagar in front of leela garden in ward 88 k nagar from shaudan to udaybhan, from arjun diwakar to pawan gautam via pandit, from ganga garden to jeevan lal in front of primary school.
Drain and c.c. road construction work in vinayak nagar in front of leela garden in ward 88 k nagar from shaudan to udaybhan, from arjun diwakar to pawan gautam via pandit, from ganga garden to jeevan lal in front of primary school.
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreAppointment of independent engineer for operation and maintenance (o and m) period on completed road projects (sh and nh) under bot (toll) bot (toll plus annuity) bot (annuity) and omt mode in the state of madhya pradesh
Appointment of independent engineer for operation and maintenance (o and m) period on completed road projects (sh and nh) under bot (toll) bot (toll plus annuity) bot (annuity) and omt mode in the state of madhya pradesh
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreArc for work of construction and commissioning of 200 mm dia tube well with pljt of pipe line with 2 years of dlp under sub division behror under jurisdiction of executive engineer phed behror district kotputli-behror.
Arc for work of construction and commissioning of 200 mm dia tube well with pljt of pipe line with 2 years of dlp under sub division behror under jurisdiction of executive engineer phed behror district kotputli-behror.
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreof your Industry type