Tender Details

Particulars Details
Title
Ttps Mech Ii Tm I Unit Ii Removal And Re Fixing Of Wool Mattress Or Cera Blanket Insulation Of Turbine Casing And Their Allied Pipe Lines, Valves During Annual Overhaul 2024 2025
Description
Ttps Mech Ii Tm I Unit Ii Removal And Re Fixing Of Wool Mattress Or Cera Blanket Insulation Of Turbine Casing And Their Allied Pipe Lines, Valves During Annual Overhaul 2024 2025
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_452844_1
Reference
Number
CE/TTPS/SE/M-II/No.146/2024-25
Tender Fee 0
EMD 4300
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539021
Start Date June 07, 2024 23:30
End Date

13/06/2024 ( Expired 376 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp

Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp&amp#x0d &amp#x0d &amp#x0d

Read more
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara

Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara

Read more
Ttps operation circle cad annual maintenance of unit ii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer ii during the forth coming annual overhaul period 2025 to 2026 in acwph

Ttps operation circle cad annual maintenance of unit ii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer ii during the forth coming annual overhaul period 2025 to 2026 in acwph

Read more
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26

Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26

Read more
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Read more
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Read more
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg

Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Read more
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Read more
Ttps mech ii tm i unit i ii iii breakdown works in turbine lub oil system seal oil system such as mot lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i unit i ii iii breakdown works in turbine lub oil system seal oil system such as mot lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026

Read more