Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Tm I Unit Ii Removal And Re Fixing Of Wool Mattress Or Cera Blanket Insulation Of Turbine Casing And Their Allied Pipe Lines, Valves During Annual Overhaul 2024 2025
|
Description |
Ttps Mech Ii Tm I Unit Ii Removal And Re Fixing Of Wool Mattress Or Cera Blanket Insulation Of Turbine Casing And Their Allied Pipe Lines, Valves During Annual Overhaul 2024 2025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_452844_1 |
Reference Number |
CE/TTPS/SE/M-II/No.146/2024-25 |
Tender Fee | 0 |
EMD | 4300 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539021 |
Start Date | June 07, 2024 23:30 |
End Date |
13/06/2024 ( Expired 334 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreKtps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii tm i unit i ii iii breakdown works in turbine lub oil system seal oil system such as mot lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i unit i ii iii breakdown works in turbine lub oil system seal oil system such as mot lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii tm i unit i ii iii breakdown maintenance of regenerative system welding of associated pipe lines for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i unit i ii iii breakdown maintenance of regenerative system welding of associated pipe lines for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii tm ii unit iv v clearing the coal ash dust from the 0mtr repair bay floor turbine 5mtr 7 5mtr 10 5 mtr floor area condenser pit sump pit cleaning work for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm ii unit iv v clearing the coal ash dust from the 0mtr repair bay floor turbine 5mtr 7 5mtr 10 5 mtr floor area condenser pit sump pit cleaning work for the period from 01 04 2025 to 31 03 2026
Read moreof your Industry type