Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Repairing And Replacement Of Bearing And Alignment Of Gearbox Model Gs 125 Installed At Drive Drum Of Unit 501 B Conveyor Belt At Moonidih Coal Washery.
|
Description |
Dismantling, Repairing And Replacement Of Bearing And Alignment Of Gearbox Model Gs 125 Installed At Drive Drum Of Unit 501 B Conveyor Belt At Moonidih Coal Washery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_326026_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1416 |
Tender Fee | 0 |
EMD | 9500 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337938 |
Start Date | January 18, 2025 14:30 |
End Date |
27/01/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work contract for repairing and restoration of siemens make dc drive for 125kw dc motor of apron feeder installed at wagon tippler installed at wagon tippler sgtps mppgcl birsinghpur.
Work contract for repairing and restoration of siemens make dc drive for 125kw dc motor of apron feeder installed at wagon tippler installed at wagon tippler sgtps mppgcl birsinghpur.
Read moreProcurement of spares for piston unit of m/s weir mineral make geho pumps model no.tzpm 250g installed at silo in hcsd system of unit 10 and 11, stps, sarni.
Procurement of spares for piston unit of m/s weir mineral make geho pumps model no.tzpm 250g installed at silo in hcsd system of unit 10 and 11, stps, sarni.
Read moreCarriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading 
 and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Read moreAttending day to day petty repair works, misc b/r works and replacement of old type u/s tube light fittings with new type energy efficient led light fittings in ms unit and air wing area at arc doom dooma under ge (af) chabua
Attending day to day petty repair works, misc b/r works and replacement of old type u/s tube light fittings with new type energy efficient led light fittings in ms unit and air wing area at arc doom dooma under ge (af) chabua
Read moreRepairing and replacement of spout liners, spout ring, tr bearing, internals of gear box, slag conveyor screw, mill fan and fd fan of tpp boilers
Repairing and replacement of spout liners, spout ring, tr bearing, internals of gear box, slag conveyor screw, mill fan and fd fan of tpp boilers
Read moreRepairing of upper and lower half casing, rotating unit, impeller, bearing housing and dynamic balancing of different type of centrifugal pumps running at amlohri project
Repairing of upper and lower half casing, rotating unit, impeller, bearing housing and dynamic balancing of different type of centrifugal pumps running at amlohri project
Read moreRepairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Repairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Read more(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
Read moreDismantling fabrication and erection of roof structure and purlin at 0-605 conveyor and bulk handling area in ab b and s plant
Dismantling fabrication and erection of roof structure and purlin at 0-605 conveyor and bulk handling area in ab b and s plant
Read moreWork of inspection and repairing of coal bunkers of boiler unit 11 at stps sarni
Work of inspection and repairing of coal bunkers of boiler unit 11 at stps sarni
Read moreof your Industry type