Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Side Shoulder In Mul Chandrapur Section Of Nh 930 Km 233.414 To Km 269.500 2 Lane Eco Sensitive Zone Of Tatr In The State Of Maharashtra On Item Rate Mode.
|
| Description |
Construction Of Side Shoulder In Mul Chandrapur Section Of Nh 930 Km 233.414 To Km 269.500 2 Lane Eco Sensitive Zone Of Tatr In The State Of Maharashtra On Item Rate Mode.
|
| Organisation | Ministry of Road Transport and Highways | P6 Delhi - MoRTH | RO Mumbai - MoRTH | NH Division-Nagpur - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 11800 |
| EMD | 1.44 Lakh |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | August 12, 2026 19:30 |
| End Date |
Open
27/10/2026
14 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs of mul chandrapur section under risk and cost in stipulated maintenance period, nh 930 km 233.414 to km 273.088 2 lane 4 lane configuration in the state of maharashtra on item rate mode.
Repairs of mul chandrapur section under risk and cost in stipulated maintenance period, nh 930 km 233.414 to km 273.088 2 lane 4 lane configuration in the state of maharashtra on item rate mode.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Read moreof your Industry type