Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Work Of Installing Interlocking Tiles At Various Places In Ward No. 13. (In Ram Nagar, Green Vatika And Hanuman Vatika)
|
Description |
Work Of Installing Interlocking Tiles At Various Places In Ward No. 13. (In Ram Nagar, Green Vatika And Hanuman Vatika)
|
Organisation | DLB | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2500 |
EMD | 1.61 Lakh |
Tender Value | |
Place | JAIPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | June 14, 2025 23:30 |
End Date |
24/06/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreConstruction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh
Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh
Read moreConst. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreof your Industry type