Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps Tm I Overhauling Load Testing And Certification Of 15 Nos Chain Blocks Of Various Capacities Available In The Area Of Main Oil Tanks Turbine Lub Oil Coolers And Seal Oil Coolers In Unit I To Iv During 2024 25
|
Description |
Mtps Tm I Overhauling Load Testing And Certification Of 15 Nos Chain Blocks Of Various Capacities Available In The Area Of Main Oil Tanks Turbine Lub Oil Coolers And Seal Oil Coolers In Unit I To Iv During 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_490547_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 210 / 2024-25 |
Tender Fee | 0 |
EMD | 1400 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582868 |
Start Date | October 03, 2024 23:30 |
End Date |
17/10/2024 ( Expired 245 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.
Read moreMtps 1 mill plant ac plant overhauling load testing and re commissioning of 3 ton capacity eot crane and load testing of electrical hoist 1 ton capacity in air washer system unit 1 to unit 4
Mtps 1 mill plant ac plant overhauling load testing and re commissioning of 3 ton capacity eot crane and load testing of electrical hoist 1 ton capacity in air washer system unit 1 to unit 4
Read moreMtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Mtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Mtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Read moreMtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26
Mtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26
Read moreMtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Read moreof your Industry type