Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Work / Repairing Work Rb And Court (Rb/Nrb) Sabalgarh Section Sub.Division Sabalgarh
|
Description |
Maintenance Work / Repairing Work Rb And Court (Rb/Nrb) Sabalgarh Section Sub.Division Sabalgarh
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id | 2024_PWDRB_337094_1 |
Reference Number |
25/2023-24/Morena/07 |
Tender Fee | 2295 |
EMD | 30420 |
Tender Value | |
Place | O/o E.E. P.W.D. Division Morena |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=396373 |
Start Date | February 26, 2024 17:35 |
End Date |
06/03/2024 ( Expired 436 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Read moreTolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreBiennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreRequest for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur
Request for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur
Read moreInstallation 215 nos and repairing 18 nos work of rain water harvesting work at various location in ratlam city as per estimate and conditions
Installation 215 nos and repairing 18 nos work of rain water harvesting work at various location in ratlam city as per estimate and conditions
Read moreBiennial maintenance contract for mechanical maintenance work of effluent treatment plant(etp) and dismantling and re-assembly of submersible motor of etp under ahp-mm and em. for two years.
Biennial maintenance contract for mechanical maintenance work of effluent treatment plant(etp) and dismantling and re-assembly of submersible motor of etp under ahp-mm and em. for two years.
Read moreof your Industry type