Tender Details

About Tender

๐Ÿ—๏ธ Invitation For Bids: Construction Of 33 Kv Line ๐Ÿ”‹ Paschimanchal Vidyut Vitran Nigam Ltd., A State Government Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of A 33 Kv Line From Dhingra To The 132 Kv Substation At Dhanaura, District Amroha. ๐Ÿ“ ๐Ÿ—“๏ธ Bid Submission Deadline: April 26, 2024, 2:00 Pm ๐Ÿ’ธ Tender Fee: Inr 3540 ๐Ÿ’ธ Earnest Money Deposit: Inr 20000 Interested Bidders Must Submit Detailed Technical And Financial Bids, Demonstrating Their Capability To Execute This Project In Accordance With The Specifications And Timelines Provided. Keywords: Construction, 33 Kv Line, Power Transmission, Paschimanchal Vidyut Vitran Nigam Ltd, State Govt. And Ut, Electrical Infrastructure, Bid Submission, Tender Documentation
Particulars Details
Title
Constraction Of 33 Kv Line Dhingra From 132 Kv Substation Dhanaura, District Amroha
Description
Constraction Of 33 Kv Line Dhingra From 132 Kv Substation Dhanaura, District Amroha
Organisation Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2024_PVVNL_920592_1
Reference
Number
53/ECWD/MBD/2023-24
Tender Fee 3540
EMD 20000
Tender Value
Place Moradabad
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1590299
Start Date March 28, 2024 19:30
End Date

14/05/2024 ( Expired 374 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line

Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.

Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.

Read more
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Read more
Providing a diesel vehicle along with driver for one year on hire basis for assistant engineer 220 kv substation piran kaliyar, 132 kv substation bhagwanpur and 132 kv substation chudiyala as a pool vehicle.

Providing a diesel vehicle along with driver for one year on hire basis for assistant engineer 220 kv substation piran kaliyar, 132 kv substation bhagwanpur and 132 kv substation chudiyala as a pool vehicle.

Read more
Periodical and round the clock maintenance job of 4 x 12.75 mw tg sets and associated electromechanical installations within power house, 132 kv substation, forebay, intake and tailrace at rhp, stage ii for 24 months

Periodical and round the clock maintenance job of 4 x 12.75 mw tg sets and associated electromechanical installations within power house, 132 kv substation, forebay, intake and tailrace at rhp, stage ii for 24 months

Read more
Wbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise