Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Conveyor Idler Repair/Manufacturing 🚢 South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Bids From Experienced Vendors For The Repairing/Manufacturing Of Bottom And Top Idlers For 1600 Mm Conveyors, Specifically For The Chp Phase 1 At The Kusmunda Open Cast Project (Kocp). 📅 Bid Submission Deadline: May 02, 2024, 11:00 Am Earnest Money Deposit (Emd): Inr 13,900 Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Pricing, And Delivery Schedules, To Meet The Project's Requirements. Keywords: Conveyor Idlers, Repair/Manufacturing, Secl, Kocp, Public Sector Undertaking, Tender, Bid Submission, Coal Mining Industry| Particulars | Details |
|---|---|
| Title |
Repairing/Making Of Bottom And Top Idlers For 1600 Mm Conveyor Required For Chp Phase 1, Kocp.
|
| Description |
Repairing/Making Of Bottom And Top Idlers For 1600 Mm Conveyor Required For Chp Phase 1, Kocp.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_306724_1 |
|
Reference Number |
SECL/GM/KSM/EnM/eT/24-25/10 |
| Tender Fee | 0 |
| EMD | 13900 |
| Tender Value | - |
| Place | KUSMUNDA OPEN CAST PROJECT |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317840 |
| Start Date | April 20, 2024 16:30 |
| End Date |
Expired
02/05/2024
Expired 893 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreHybrid conveyor rollers (top idlers) for 1400 mm wide belt,hybrid conveyor rollers (return idlers)
Read more
Procurement of 1100mm idlers for chp conveyor/nkstpp on urgent basis.
Procurement of 1100mm idlers for chp conveyor/nkstpp on urgent basis.
Read moreMaintenance work of coal sampler units installed with conveyor c37 and c38 at chp phase-1, kocp
Maintenance work of coal sampler units installed with conveyor c37 and c38 at chp phase-1, kocp
Read moreProcurement of carrying, v-return and impact idlers for conveyor system of chp/dpps.
Procurement of carrying, v-return and impact idlers for conveyor system of chp/dpps.&#x0d &#x0d &#x0d
Read moreSupply of various types of idlers for conveyor system installed at chp, csctpp, chhabra
Supply of various types of idlers for conveyor system installed at chp, csctpp, chhabra
Read moreStrengthening of lmv crossing overbridge at c-9/c-10 conveyor of chp phase-ii at kocp of kusmunda area.
Strengthening of lmv crossing overbridge at c-9/c-10 conveyor of chp phase-ii at kocp of kusmunda area.
Read moreof your Industry type