Tender Details
Particulars | Details |
---|---|
Title |
Electrical Work In Connection With Provision Of Air Conditioning In Engineering Department Unit And Personnel Department Of Drm Office Ahmedabad.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78111146 |
Reference Number |
EL-50-1-ADI-T-66-2024-25 |
Tender Fee | 0 |
EMD | 3.13 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78111146/viewNitPdf_4753094.pdf |
Start Date | November 07, 2024 22:59 |
End Date |
04/12/2024 ( Expired 166 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreDevelopment of msrtc establishments along with commercial facilities on plot of land owned by the maharashtra state road transport corporation(msrtc) at sangli bs, sangli madhavnagar bs and depot, sangli division office in sangli district through ppp
Development of msrtc establishments along with commercial facilities on plot of land owned by the maharashtra state road transport corporation(msrtc) at sangli bs, sangli madhavnagar bs and depot, sangli division office in sangli district through ppp
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreModification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreKozhikode branch of kerala bank interior electrical and air condition work
Interior, electrical and air condition work of kozhikode branch of kerala state co-operative bank ltd
Read moreof your Industry type