Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Pothundy Project Flood Damages 2024 25 Canal Cleaning Works Of Kairady Branch Canal ( Between Ch. 7 / 400 Km And 7 / 900 Km ) And Kalchady Branch Canal ( Between Ch. 5/500km And 5/650km And Ch. 6 / 500 Km And 8 / 000 Km )
|
Description |
Canal Cleaning Works Of Kairady Branch Canal&Amp#X0d
And Kalchady Branch Canal
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_696900_1 |
Reference Number |
IRR/PI/TR/6382/2024_5_1_1/1 NMA |
Tender Fee | 560 |
EMD | 6531 |
Tender Value | |
Place | Nemmara |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1086787 |
Start Date | October 16, 2024 14:30 |
End Date |
19/10/2024 ( Expired 248 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
General-csm -2025-26-emergency monsoon preparedness- cutting damaged and dangerous trees from the canal bund between the ch.22/950 km to 40/900 km- and branch canals-general civil work
General-csm -2025-26-emergency&#x0d monsoon preparedness- cutting damaged and&#x0d dangerous trees from the canal bund between&#x0d the ch.22/950 km to 40/900 km- and branch&#x0d canals-general civil work
Read moreConstruction of earthwork and lining of km 5 and 6 of minor no.47 (babhali dy.) at rd 37700 m and minor no.1, 2, 3, 4, 5,6, 7 and 8 at rd 1100, 1360, 2770, 3020, 4290, 5110 and 5685m of babhali dy on kayadhu branch canal
Construction of earthwork and lining of km 5 and 6 of minor no.47 (babhali dy.) at rd 37700 m and minor no.1, 2, 3, 4, 5,6, 7 and 8 at rd 1100, 1360, 2770, 3020, 4290, 5110 and 5685m of babhali dy on kayadhu branch canal
Read moreGeneral-sabarimala festival 2024-25 (upgradation with bm and bc -7.125 km)improvements to alummavu kuroor road from ch.0/000 to 4/625 and mp varghese road from ch.0/000 to 2/500 by providing bm and bc works -general civil work-1
Clearing, filling up pot holes, gsb, wmm , bm, bc, interlocking tile,drain and irish drain , dry rubble masonry, p.c.c, rcc raft foundation, abutment, wingwall, parapets slab are provided for culvert construction, traffic safety measures works
Read moreGeneral chandera trikkaripur olavara road raised footpath and road safety works between km 0 000 and 5 500 general civil work
General chandera trikkaripur olavara&#x0d road raised footpath and road safety works&#x0d between km 0 000 and 5 500 general civil&#x0d work
Read moreFdr fdr works 2024 25 construction of drain at vazhani road at ch 1 000 to 1 100 1 600 to 1 800 and 5 200 to 5 400 general civil work
Fdr fdr works 2024 25 construction of drain at vazhani road at ch 1 000 to 1 100 1 600 to 1 800 and 5 200 to 5 400 general civil work
Read moreConstruction of cement concrete drain in km 4 650 to 5 350 5 500 to 7 00 and 7 500 to 8 400 on pusad karla devthana jamnaik mdr 36 tq pusad dist yavatmal
Construction of cement concrete drain in km 4 650 to 5 350 5 500 to 7 00 and 7 500 to 8 400 on pusad karla devthana jamnaik mdr 36 tq pusad dist yavatmal
Read morePothundy project - 2024 - 25 - rectification works between ch . 3/100 km and 3/ 160km of kairady branch canal
The work is proposed for the urgent&#x0d rectification of kairady branch canal
Read moreGeneral wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
General wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
Read moreGeneral fdr 2024 25 improvements to kalapathoor velliyoor kappummel road between km 6 000 to 7 500-in kozhikkode dist general civil work
Gsb bm and bc road marking drain and&#x0d culvert dr masonry hard shoulder road&#x0d marking&#x0d
Read moreDeposit-deposit works-kyip 2024-25 construction of canal bund road between ch 0/300 km and 0/400 km of pallikkara field bothie canal (pallikkara central l.p canal mukku-vattakuni thazha road ) in tikkodi grama panchayath-phase 1-general civil work
Kyip 2024-25 construction of canal bund road between ch 0/300 km and 0/400 km of pallikkara field bothie canal (pallikkara central l.p canal mukku-vattakuni thazha road ) in tikkodi grama panchayath-phase 1-general civil work
Read moreof your Industry type