Tender Details

Particulars Details
Title
Construction Of Pucca Check Dam On Baghwanwa Nala, Village Sikni,G.P Arka, Block Tarahasi, Dist Palamu
Description
Construction Of Pucca Check Dam On Baghwanwa Nala, Village Sikni,G.P Arka, Block Tarahasi, Dist Palamu
Organisation WRD EinC Major-Med n Minor | State Govt. and UT
Tender Id 2024_WRD_85373_1
Reference
Number
WRD/MID MEDININAGAR/F2-04(1)/2023-24
Tender Fee 10000
EMD 1.26 Lakh
Tender Value
Place Medininagar
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=114518
Start Date March 11, 2024 21:30
End Date

28/03/2024 ( Expired 413 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.

Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.

Read more
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham

Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham

Read more
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service

Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service

Read more
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode

Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode

Read more
Construction of check dam across marudhaiyar river at varanavasi village in ariyalur taluk and district

Construction of check dam across marudhaiyar river at varanavasi village in ariyalur taluk and district

Read more
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode

Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode

Read more
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more

Protection work for a length of 650.00 m along the left bank of river mahananda from bareks house to nimtala ghat at village-gopalpur under g.p.-kapasia in block and p.s.- itahar, dist.- uttar dinajpur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise