Tender Details

Particulars Details
Title
Renewal Of Comprehensive Insurance Of King Air B200 Gt, Vt Hca Equipped With Rockwell Collins Pro Line Fusion Digital Avionics Suite, Phase 3 Upgrade Aircraft From 01.01.2024 To 31.12.2024
Description
Renewal Of Comprehensive Insurance Of King Air B200 Gt, Vt Hca Equipped With Rockwell Collins Pro Line Fusion Digital Avionics Suite, Phase 3 Upgrade Aircraft From 01.01.2024 To 31.12.2024
Organisation Government of Haryana
Tender Id 2023_HRY_328701_1
Reference
Number
CAD/V-16
Tender Fee 0
EMD 0
Tender Value
Place CHANDIGARH
Link https://etenders.hry.nic.in
Start Date November 15, 2023 16:30
End Date

05/12/2023 ( Expired 536 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l

Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l

Read more
Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m

Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m

Read more
Installation and commissioning of 3 phase 4 wire 3.3 kv overhead line from sarpi substation to majhi para bore hole with energy meter for proposed lhcm2 of gcpl in rviia seam at shyamsundarpur colliery under bankola area.

Installation and commissioning of 3 phase 4 wire 3.3 kv overhead line from sarpi substation to majhi para bore hole with energy meter for proposed lhcm2 of gcpl in rviia seam at shyamsundarpur colliery under bankola area.

Read more
Installation and commissioning of 3 phase 4 wire 3.3 kv overhed line from esp substation with continuous earthing to new drivage substation for incline drivage at shyamsundarpur colliery

Installation and commissioning of 3 phase 4 wire 3.3 kv overhed line from esp substation with continuous earthing to new drivage substation for incline drivage at shyamsundarpur colliery

Read more
Comprehensive insurance of king air b200gt vt hca equipped with rockwell collins pro line fusion digital avionics suite phase 3 upgrade aircraft from 01.01.2025 to 31.12.2025

Comprehensive insurance of king air b200gt vt hca equipped with rockwell collins pro line fusion digital avionics suite phase 3 upgrade aircraft from 01.01.2025 to 31.12.2025

Read more
Shifting, heightening of existing 11kv and lt line for widening of road from fursund to talakot 00/00 to 22/00km under electrical section,sinapali in the district of nuapada.provision for erection of 9 mtr psc poles,11kv line with 3 phase,3 wire 10

Shifting, heightening of existing 11kv and lt line for widening of road from fursund to talakot 00/00 to 22/00km under electrical section,sinapali in the district of nuapada.provision for erection of 9 mtr psc poles,11kv line with 3 phase,3 wire 10

Read more
Maintenance of overhead line 440 volts 3 phase 4 wire circuit from gm office switch room to road weighbridge no 1 and rs bhowra along with electrical repair and maintenance of gm office generator electrical control room under e j area

Maintenance of overhead line 440 volts 3 phase 4 wire circuit from gm office switch room to road weighbridge no 1 and rs bhowra along with electrical repair and maintenance of gm office generator electrical control room under e j area

Read more
Replacement of defunct ms pipes and rusted platform drain gutter with upvc pipe and gi drain gutter from ramesh nagar to tilak nagar in line-3 section.

Replacement of defunct ms pipes and rusted platform drain gutter with upvc pipe and gi drain gutter from ramesh nagar to tilak nagar in line-3 section.

Read more
Construction of 3-phase 132 kv s/c line on double circuit towers from 132 kv gss mandawa to 132/25 kv tss kayamsar( 28 km approx.) with modification of existing 220 kv s/c khetri-ratangarh line on turnkey basis (deposit work of railway) bn-9018002336

Construction of 3-phase 132 kv s/c line on double circuit towers from 132 kv gss mandawa to 132/25 kv tss kayamsar( 28 km approx.) with modification of existing 220 kv s/c khetri-ratangarh line on turnkey basis (deposit work of railway) bn-9018002336

Read more
(line no- 02, work no- 64) under national clean air programme (ncap) construction work of side patri using cc interlocking tiles from transport nagar to mainather culvert on lakri bypass with comprehensive operation and maintenance of 5 years.

Under national clean air programme (ncap) construction work of side patri using cc interlocking tiles from transport nagar to mainather culvert on lakri bypass with comprehensive operation and maintenance of 5 years.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise