Tender Details

About Tender

🚂 Procurement Opportunity: Heavy Duty Polyester Flat Quadruple Webbing Sling 🛠️💪 The Ministry Of Railways, Central Government, Invites Tenders For The Supply Of Heavy Duty High Tenacity 100 Percent Polyester Flat Quadruple Webbing Slings With Anti Abrasive Sleeves. 🪢 📏 Specifications: Capacity: 10 Ton Length: 2 Meters Width: 5 Inches Each Sling Will Feature A Loop At Both Ends And Will Be Stitched In The Middle. 📜 Submitted Tenders Must Include A Test Certificate In Form 11/12 Or The Latest Equivalent, Signed By A Competent Person Authorized By The Directorate Of Industrial Safety And Health, 1963, Or An Equivalent Body. Bid Submission Deadline: 22/05/2024, 2:00 Pm (Gmt+5:30) Interested Suppliers Should Carefully Review The Tender Documents For Complete Details And Submission Guidelines. Keywords: Heavy Duty Polyester Sling, Webbing Sling, High Tenacity, Anti Abrasive Sleeve, Ministry Of Railways, Tender, Industrial Safety And Health, Government Procurement
Particulars Details
Title
Heavy Duty High Tenacity 100 Percent Polyester Flat Quadruple Webbing Sling Fully Covered With Anti Abrasive Sleeve Stitched In The Middle, Loop At Both Ends. Capacity: 10 Ton, Length: 02meters, Width: 05 Inch. Note: Test Certificate To Be Provided In Form 11/12 Or Latest Signed By The Competent Person Authorized By The Directorate Of Industrial Safety And Health 1963 Or Equivalent Body.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106341779
Reference
Number
EA245054
Tender Fee 0
EMD 0
Tender Value -
Place Kolkata
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106341779/viewNitPdf_4565833.pdf

Start Date May 09, 2024 21:25
End Date
Expired 22/05/2024

Expired 857 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
List of work in hand/ existing commitments er signed by the executive engineer.

C/o protection work and drain at rd 3/800 to 4/800 and c.c.pavement in km 4/000 to 4/150 and drain in km 3/750 to 3/900 in various straches of roads in various straches of road

Read more
Declaration duly filled and signed by the contractor. no-60-karakkad murikkoli parambu road concreting in ward-11 (1.50l)-general civil work

Declaration duly filled and signed by the contractor. no-60-karakkad murikkoli parambu road concreting in ward-11 (1.50l)-general civil work

Read more
Resurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of yerehalli block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 9.00 km in tarikere range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of machina block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 19.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of kunda rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 14.00 km in agumbe range, shimoga division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of kunda rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 14.00 km in agumbe range, shimoga division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of koyyoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 13.80 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of koyyoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 13.80 km in uppinangadi range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of dodderi block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 11.30 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of dodderi block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 11.30 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of sonandoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of sonandoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of sampaje rf extn block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.10 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of sampaje rf extn block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.10 km in sullia range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Resurvey of yadehalli block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 15.00 km in anandapura range, sagara division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of yadehalli block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 15.00 km in anandapura range, sagara division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise