Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Operation Circle Cad Dismantling Of Worn Out Earth Flats And Providing New Earth Flats And Earth Pipes In Ldo Unloading Point And Sump Pump Area Of Fuel Oil Pump House
|
| Description |
Ttps Operation Circle Cad Dismantling Of Worn Out Earth Flats And Providing New Earth Flats And Earth Pipes In Ldo Unloading Point And Sump Pump Area Of Fuel Oil Pump House
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_495806_1 |
|
Reference Number |
CE/SE/O/TTPS/Spec.No.247/24-25 |
| Tender Fee | 0 |
| EMD | 600 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=589101 |
| Start Date | October 22, 2024 22:20 |
| End Date |
Expired
07/11/2024
Expired 709 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle cad dismantling of worn out earth flats and providing new earth flats and earth pipes in light oil tank and heavy oil tank area of fuel oil pump house
Ttps operation circle cad dismantling of worn out earth flats and providing new earth flats and earth pipes in light oil tank and heavy oil tank area of fuel oil pump house
Read moreTtps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Read moreTtps operation circle cad dismantling, fabrication and renewal of worn out, damaged 200 nb pipe of service water i and ii discharge to oht i for a length of 190 mtrs including supply of 200 nb ms seamless pipe
Ttps operation circle cad dismantling, fabrication and renewal of worn out, damaged 200 nb pipe of service water i and ii discharge to oht i for a length of 190 mtrs including supply of 200 nb ms seamless pipe
Read moreTtps es em iii replacement of worn out area of gi earth flat by new earth flat size 50 x 10 mm and reconditioning of earth pits in esp iv area of unit iv
Ttps es em iii replacement of worn out area of gi earth flat by new earth flat size 50 x 10 mm and reconditioning of earth pits in esp iv area of unit iv
Read moreTtps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Ttps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreTtps operation circle cad dismantling of worn out earth flats and earth pipes and providing new earth flats and earth pipes for dg iv and v earthing system
Ttps operation circle cad dismantling of worn out earth flats and earth pipes and providing new earth flats and earth pipes for dg iv and v earthing system
Read moreTtps operation circle cad replacing of existing worn out earth flats by new earth flats for swbp motors and providing new earth flats for self cleaning strainer motors at unit-iv v of acw system
Ttps operation circle cad replacing of existing worn out earth flats by new earth flats for swbp motors and providing new earth flats for self cleaning strainer motors at unit-iv v of acw system
Read moreTtps operation circle cad acwph unit i annual overhauling dismantling and renewal of worn out and punctured pipes of bearing cooling water return header 600 nb ms pipe line of unit i acw system near repair bay area
Ttps operation circle cad acwph unit i annual overhauling dismantling and renewal of worn out and punctured pipes of bearing cooling water return header 600 nb ms pipe line of unit i acw system near repair bay area
Read moreof your Industry type