Tender Details
Particulars | Details |
---|---|
Title |
Improvement And Constructing To Protection Wall On Sh6 Umarde Bk Phata To Gujarjambholi Road Vr 6 Km Ch.0/00 To 3/00 Tal. Dist Nandurbar
|
Description |
Improvement And Constructing To Protection Wall On Sh6 Umarde Bk Phata To Gujarjambholi Road Vr 6 Km Ch.0/00 To 3/00 Tal. Dist Nandurbar
|
Organisation | RDD-CEO-NANDURBAR | State Govt. and UT |
Tender Id | 2025_NANDU_1133861_5 |
Reference Number |
2024_NANDU_ETN-27/2024-25 |
Tender Fee | 2500 |
EMD | 42000 |
Tender Value | |
Place | Nandurbar |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1976399 |
Start Date | January 06, 2025 15:30 |
End Date |
20/01/2025 ( Expired 119 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreImprovement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.
Improvement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreMtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Read morePr of road from mashauli barrage road to satya sundar datta house under kumarghat rd block length 0 600 km during the year 2025 26 sh stripping wbm 3 carpetting and seal coat etc
Pr of road from mashauli barrage road to satya sundar datta house under kumarghat rd block length 0 600 km during the year 2025 26 sh stripping wbm 3 carpetting and seal coat etc
Read moreof your Industry type