Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm Ii Ac Plant Replacement Of Worn Out Auxiliary Cooling Water Inlet And Outlet Pipe Line From 400 Mm Header Pipe To Service Building Package Unit And Wornout Expansion Valve
|
Description |
Ttps Operation Circle Mpm Ii Ac Plant Replacement Of Worn Out Auxiliary Cooling Water Inlet And Outlet Pipe Line From 400 Mm Header Pipe To Service Building Package Unit And Wornout Expansion Valve
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_502834_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.250/24-25 |
Tender Fee | 0 |
EMD | 1700 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=598025 |
Start Date | November 20, 2024 22:30 |
End Date |
04/12/2024 ( Expired 138 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Read moreTtps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm-i unit ii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit ii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm i attending to prive and breakdown maintenance works in the 7.5 ton capacity eot cranes of unit i, ii iii mill plant for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm i attending to prive and breakdown maintenance works in the 7.5 ton capacity eot cranes of unit i, ii iii mill plant for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii acp attending emergency works in condenser, chiller pumps, cw pumps, cw pipe lines, cleaning of ac plant equipments, assisting shift operators in changeover of running equipments etc., in ac plant air washer system etc
Ttps operation circle mpm ii acp attending emergency works in condenser, chiller pumps, cw pumps, cw pipe lines, cleaning of ac plant equipments, assisting shift operators in changeover of running equipments etc., in ac plant air washer system etc
Read moreTtps operation circle mpm ii unit iv v overhauling of roller journal assembly and renewal of wornout grinding rolls of hp 803 mills for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii unit iv v overhauling of roller journal assembly and renewal of wornout grinding rolls of hp 803 mills for a period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii acp stage i, ii, iii cleaning of filters, cooling coils, condensers, cooling towers and greasing of bearings in ac plants and periodical overhauling of pumps, equipments from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii acp stage i, ii, iii cleaning of filters, cooling coils, condensers, cooling towers and greasing of bearings in ac plants and periodical overhauling of pumps, equipments from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii acp repairs and replacement of failed compressor in ac split ac renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii acp repairs and replacement of failed compressor in ac split ac renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii acp stage i, ii iii attending break down works in ac plant unit i to v, switch yard compressors etc. for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii acp stage i, ii iii attending break down works in ac plant unit i to v, switch yard compressors etc. for a period from 01.04.2025 to 31.03.2026
Read moreof your Industry type