Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm Ii Ac Plant Replacement Of Worn Out Auxiliary Cooling Water Inlet And Outlet Pipe Line From 400 Mm Header Pipe To Service Building Package Unit And Wornout Expansion Valve
|
Description |
Ttps Operation Circle Mpm Ii Ac Plant Replacement Of Worn Out Auxiliary Cooling Water Inlet And Outlet Pipe Line From 400 Mm Header Pipe To Service Building Package Unit And Wornout Expansion Valve
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_502834_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.250/24-25 |
Tender Fee | 0 |
EMD | 1700 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=598025 |
Start Date | November 20, 2024 22:30 |
End Date |
04/12/2024 ( Expired 215 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v
Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v
Read moreNctps ii mi circle mpm unit ii mills 2c 2g replacement worn out grinding rollers and bull ring segments
Nctps ii mi circle mpm unit ii mills 2c 2g replacement worn out grinding rollers and bull ring segments
Read moreTtps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Read moreTtps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Ttps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Read moreTtps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Read moreTtps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks
Ttps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks
Read moreTtps operation circle oe ii erection of 150 mtrs 200 nb ms erw pipe lines for fire protection mulsifyre line from clarified water pump house to service building
Ttps operation circle oe ii erection of 150 mtrs 200 nb ms erw pipe lines for fire protection mulsifyre line from clarified water pump house to service building
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Read moreof your Industry type