Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Providing Drainage Facilities On Matchfactory Cheliya Kanhilasseri Road Between Ch 3/500 And 3/700. Providing Drainage Facilities On Matchfactory Cheliya Kanhilasseri Road Between Ch 3/500 And 3/700 General Civil Work
|
| Description |
General Providing Drainage Facilities On&Amp#X0d
Matchfactory Cheliya Kanhilasseri Road&Amp#X0d
Between Ch 3/500 And 3/700. Providing&Amp#X0d
Drainage Facilities On Matchfactory Cheliya&Amp#X0d
Kanhilasseri Road Between Ch 3/500 And&Amp#X0d
3/700 General Civil Work
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_674439_1 |
|
Reference Number |
D2/TN/14/2023-24(14) |
| Tender Fee | 1460 |
| EMD | 16519 |
| Tender Value | - |
| Place | Cheliya |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1048898 |
| Start Date | June 06, 2024 20:30 |
| End Date |
Expired
14/06/2024
Expired 853 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General construction of drainage fascilities between ch 4/700 4/500 thazhe karani townvnear petrol pump on pachilakkad meenangadi road in wayanad
General construction of drainage fascilities between ch 4/700 4/500 thazhe karani townvnear petrol pump on pachilakkad meenangadi road in wayanad
Read moreGeneral kyip acp plan 2026 27 rectification work at rbmc in between ch 18 500 km to ch 19 500 km general civil work
General kyip acp plan 2026 27 rectification work at rbmc in between ch 18 500 km to ch 19 500 km general civil work
Read moreInstallation of street light, high mast light and divider in built-up area between ch. 32/500 to 50/500 on nh-162a
Installation of street light, high mast light and divider in built-up area between ch. 32/500 to 50/500 on nh-162a
Read moreCulvert repair work on akyaghlot to semli gehlot ch. 1/700.
Culvert repair work on akyaghlot to semli gehlot ch. 1/700.
Read moreRoad safety works including crash barriers interlocking blocks retaining wall roadside drainage junction improvement at barekhan fanta and dholapani (ch. 27/500 and 44/500), and slope stabilization from ch. 84/0 to 85/0 on nh-56
Road safety works including crash barriers interlocking blocks retaining wall roadside drainage junction improvement at barekhan fanta and dholapani (ch. 27/500 and 44/500), and slope stabilization from ch. 84/0 to 85/0 on nh-56
Read moreGeneral budget rectification work urgent leak rectification works of flume in oyoor distributary between ch 450 m 500 m and ch 800 m 900 m in pooyappally grama panchayath general civil work
General budget rectification work urgent leak rectification works of flume in oyoor distributary between ch 450 m 500 m and ch 800 m 900 m in pooyappally grama panchayath general civil work
Read moreGeneral reconstruction of culvert at malayinkeezhu pappanamcodu road ch 1 700 general civil work
General reconstruction of culvert at malayinkeezhu pappanamcodu road ch 1 700 general civil work
Read moreImprovement/ upgradation of hamirpur kona between rd 0-1700m and sajwal minor between rd 500-2200m at places.
Improvement/ upgradation of hamirpur kona between rd 0-1700m and sajwal minor between rd 500-2200m at places.
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read moreGeneral kip o m section no 7 2 kalanjoor rectification works of konni distributory between ch 1323 m 1560m and between ch 15400 to 17800m general civil work
General kip o m section no 7 2 kalanjoor rectification works of konni distributory between ch 1323 m 1560m and between ch 15400 to 17800m general civil work
Read moreof your Industry type