Tender Details

Particulars Details
Title
Construction Of Retaining Wall With Shutter Arrangements In The Infall Point Of Nainikattalai Vadigal Voikal In The Lb Of Pravadayanar River Near Thittacherry Road Culvert In T.R.Pattinam Commune
Description
Construction Of Retaining Wall With Shutter Arrangements In The Infall Point Of Nainikattalai Vadigal Voikal In The Lb Of Pravadayanar River Near Thittacherry Road Culvert In T.R.Pattinam Commune
Organisation Public Works Department | State Govt. and UT
Tender Id 2025_PWDC3_18711_1
Reference
Number
11-02/PW/IPH/2025-26
Tender Fee 525
EMD 13609
Tender Value
Place Karaikal
Link https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=19066
Start Date June 02, 2025 21:30
End Date

12/06/2025 ( Expired 6 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Construction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand

Construction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand

Read more
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.

Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.

Read more
Provn of 04 x toilets in 28/4 camp, addition/alteration of road, culvert at depot entry gate, provn of hard standing at risepta, pathway at 9 cib, brick wall and re-fixing of rolling shutter in building no p-13 (rice shed) at mil stn yol

Provn of 04 x toilets in 28/4 camp, addition/alteration of road, culvert at depot entry gate, provn of hard standing at risepta, pathway at 9 cib, brick wall and re-fixing of rolling shutter in building no p-13 (rice shed) at mil stn yol

Read more
Construction work of drain and c.c. road from anil dj walas house in ward-47 kila cantonment via sohanlals house to ganga rams house near kila river.

Construction work of drain and c.c. road from anil dj walas house in ward-47 kila cantonment via sohanlals house to ganga rams house near kila river.

Read more
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc

Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&amp#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Construction of retaining wall on drain side near garden at shiv sagar in ward no. 79 under zone no. 21

Construction of retaining wall on drain side near garden at shiv sagar in ward no. 79 under zone no. 21

Read more
Construction of cause way with side protection wall and culvert near phvi anchor 3

Construction of cause way with side protection wall inlet and outlet chamber for pipe culvert in between hair pin bend 4 to 6 of power house vi porthimund road over breached portion of water way along with construction of side drain

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise