Supply Of 4950 Meters Of Cast Basalt Lined M S Pipes For Ash Slurry Disposal Pipe Line No 4 In Nctps I
|
| Description |
Supply Of 4950 Meters Of Cast Basalt Lined M S Pipes For Ash Slurry Disposal Pipe Line No 4 In Nctps I
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_433717_1 |
|
Reference Number |
CE-244/2023-2024/NCTPS-I |
| Tender Fee | 0 |
| EMD | 6 Lakh |
| Tender Value | - |
| Place | NCTPS 1 Chennai |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=515546 |
| Start Date | March 02, 2024 00:25 |
| End Date |
Expired
06/03/2024
Expired 954 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nctps i se m ii circle ahp dn complete cleaning of outer surface of cast basalt lined ms pipe having od 406 mm and painting coal tar paint in ash slurry disposal line 2 and 3 from recovery water pump house to ash dyke discharge end
Nctps i se m ii circle ahp dn complete cleaning of outer surface of cast basalt lined ms pipe having od 406 mm and painting coal tar paint in ash slurry disposal line 2 and 3 from recovery water pump house to ash dyke discharge end
Read moreTtps mechii ahp ash slurry disposal lines of unit iv v scrapping removal of ash slag under the culverts near unit iv v entrance 457 5 e road crossing and cleaning of pipes in all ash slurry disposal lines
Ttps mechii ahp ash slurry disposal lines of unit iv v scrapping removal of ash slag under the culverts near unit iv v entrance 457 5 e road crossing and cleaning of pipes in all ash slurry disposal lines
Read moreTtps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreSupply of 5592 meters of cast basalt lined m.s pipes for ash slurry disposal pipe line no.5 in nctps-i
Supply of 5592 meters of cast basalt lined m.s pipes for ash slurry disposal pipe line no.5 in nctps-i
Read moreSupply of 4860 meters of cast basalt lined m.s pipes for ash slurry disposal pipe line no.1 in nctps-i
Supply of 4860 meters of cast basalt lined m.s pipes for ash slurry disposal pipe line no.1 in nctps-i
Read moreSupply of 15402 meters of cast basalt lined m.s pipes for ash slurry disposal pipe line no.1,4 and 5 in nctps i.
Supply of 15402 meters of cast basalt lined m.s pipes for ash slurry disposal pipe line no.1,4 and 5 in nctps i.
Read moreSupply of 15402 metres of cast basalt lined m s pipes for ash slurry disposal pipe line no 1 4 and 5 in nctps i
Supply of 15402 metres of cast basalt lined m s pipes for ash slurry disposal pipe line no 1 4 and 5 in nctps i
Read moreof your Industry type