Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🚂 Procurement Opportunity: Widening Of Cutting In Boulder Falling Location 🛠️ The Ministry Of Railways, Central Government, Invites Bids For The Widening Of Cutting In Boulder Falling Locations At Km 800/21 41 And Km 803/11 29 On The Bhtk Koi Up Line Under The Jurisdiction Of Aden/Pendra, Bilaspur Division. 📅 Bid Submission Deadline: April 29, 2024, 11:00 Am The Tender Fee Is Inr 0, With An Earnest Money Deposit (Emd) Of Inr 4,53,200. Interested Contractors Must Review The Complete Tender Documents For Detailed Project Specifications, Requirements, And Submission Guidelines. Keywords: Ministry Of Railways, Infrastructure, Civil Works, Boulder Falling Location, Tender, Bid, Bilaspur Division, Aden/PendraParticulars | Details |
---|---|
Title |
Widening Of Cutting In Boulder Falling Location At Km 800/21 41 &Amp Km 803/11 29 Between Bhtk Koi Up Line Under The Jurisdiction Of Aden/Pendra Of Bilaspur Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73991233 |
Reference Number |
DRM-ENGG-BSP-T-126-23-24 |
Tender Fee | 0 |
EMD | 4.53 Lakh |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73991233/viewNitPdf_4502394.pdf |
Start Date | March 28, 2024 22:06 |
End Date |
29/04/2024 ( Expired 414 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Execution of track works like tbr-49.803 kms & widening of cutting bet:.up line side at km 799/13-19 at the approach of up tunnel under the jurisdiction of sr.den/central, bilaspur.
For complete deion and other details, please refer to tender
Read moreExecution of signaling & telecommunication work in connection with: (1) bilaspur-durg: bilaspur - durg ctr(s) - 13.393 tkm & raipur - lakholi - ctr(s) - 18.659 tkm., (2) bilaspur-durg-ttr(cmsc)- 37 sets, ttr (tws)- 21 set & ttr (cs) - 41 sets, (3) construction of rub (fhs) at km 734/33-735/35a in lieu of manned level crossing no. 373 (belha yard) at km 734/25-27 between belha-dagori section in howrah-mumbai main line on cost sharing basis, (4) construction of rub in lieu of lc no.
For complete deion and other details, please refer to tender
Read moreConstruction of rcc cast in situ central drain(approx 1km) & side drain of up & dn & dn & 3rd line between mngd-thv at km:292/08-20, 293/05-294/1, 294/1-295/25, 296/24-42, 298/01-18, 298/28-299/15, 300/12-24, 300/ 34-09 , 303/ 01-304 /08 (between mngd-bmck), 305/07-306/28, 306/28-307/1, 308/2-323/12 (between bmck-thv) under the jurisdiction of aden/muniguda of sambalpur division.
For complete deion and other details, please refer to tender
Read moreProvision of retaining wall in ghat section bet: koi-bhtk & widening of cutting in boulder falling location at km 796/42-797/20 bet: up and dn line in bhtk-koi section under the jurisdiction of aden/pendra.
For complete deion and other details, please refer to tender
Read moreSw-i) bza division: gdr-bza section: in connection with rehabilitation of weak formation proposed di work for a length of 5.00 km new up line from km:361-364 & km: 370 - 372 (project id: 11.06.31.23.1.55.025 of 2023-24) in aden/bpp sub-divisions of den/central/bza jurisdiction. sw-ii) bza division: gdr-bza section: in connection with rehabilitation of weak formation proposed di work for a length of 2.50 km new up line between km:364-370 (project id: 11.06.31.22.1.55.00
For complete deion and other details, please refer to tender
Read moreSw-i) bza division: gdr-bza section: in connection with rehabilitation of weak formation proposed di work for a length of 5.00 km new up line from km:361-364 & km: 370 - 372 (project id: 11.06.31.23.1.55.025 of 2023-24) in aden/bpp sub-divisions of den/central/bza jurisdiction. sw-ii) bza division: gdr-bza section: in connection with rehabilitation of weak formation proposed di work for a length of 2.50 km new up line between km:364-370 (project id: 11.06.31.22.1.55.00
For complete deion and other details, please refer to tender
Read moreGtl division: 1. construction of ballast retaining wall between up & dn line at km : 255/800-256/200, 256/900-257/300 in sse/p.way/hx section of aden/hx sub division 2. construction of toe wall between up & dn main lines ch: 336/450-336/1300 between kdp - mum to a total length of 850mts. 3. excavation for widening of existing formation in cutting in hard soil which require picks or crowbars for hacking including soils containing stones or boulders of size under 0.03cum without inf
For complete deion and other details, please refer to tender
Read moreConstruction of balance catch water drain, boundary wall at various locations, footpath of two major bridges at ch.95465 (5 x 9.15m psc girder) and ch.94415(6 x 9.15m psc girder), repair to existing slope of bank, cutting and miscellaneous work between solapurwadi to amalner in connection with ahmednagar-beed-parli vaijnath new bg line project.
For complete deion and other details, please refer to tender
Read moreSpecial repair on nh 505a km 0 to 17 sh restoration to highway by construction of retaining walls in pcc retaining walls in wire crates, breast walls in pcc and breast walls in wire crates at various reaches between km 0 to 17 in the state of himacha
Special repair on nh 505a km 0 to 17 sh restoration to highway by construction of retaining walls in pcc retaining walls in wire crates, breast walls in pcc and breast walls in wire crates at various reaches between km 0 to 17 in the state of himacha
Read moreSpecial repair on nh 305 sainj luhri aut road, construction of retaining walls between km 3 to 8 and km 64 to 94 800 in the state of himachal pradesh on epc mode
Special repair on nh 305 sainj luhri aut road, construction of retaining walls between km 3 to 8 and km 64 to 94 800 in the state of himachal pradesh on epc mode
Read moreof your Industry type