Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Electrification Work Over 2 Lane Rob 34 A Cheoki In Distt. Prayagraj
|
| Description |
Electrification Work Over 2 Lane Rob 34 A Cheoki In Distt. Prayagraj&Amp#X0d
Under Construction By Bcu Prayagraj
|
| Organisation | UP STATE BRIDGE CORPORATION LIMITED | State Govt. and UT |
| Tender Id | 2024_UPSBC_944316_1 |
|
Reference Number |
132/A-18/Tender/M.U.PRG./24-25 |
| Tender Fee | 250 |
| EMD | 1.18 Lakh |
| Tender Value | |
| Place | PRAYAGRAJ |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1635198 |
| Start Date | August 07, 2024 17:30 |
| End Date |
Expired
15/08/2024
Expired 690 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rain water harvesting work in irrigation colony govindpur, prayagraj. lot_1
Rain water harvesting work in irrigation colony govindpur, prayagraj
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreSingle stage door step delivery handling and transport work (year 2026-27 and 2027-28) at block/center/cluster dhanupur in district prayagraj.
Single stage door step delivery handling and transport work (year 2026-27 and 2027-28) in prayagraj region.
Read moreRoad safety work on kanth to mahmoodpur azmabad road (odr) in distt. shahjahanpur
Road safety work on kanth to mahmoodpur azmabad road (odr) in distt. shahjahanpur
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreDevelopment works in unauthorized colonies. c/o roads and s.w. rcc and brick work drains at shiv vihar phase-3 (part-2) in mustafabad (a.c.69) (regn. no.766).
Development works in unauthorized colonies. c/o roads and s.w. rcc and brick work drains at shiv vihar phase-3 (part-2) in mustafabad (a.c.69) (regn. no.766).
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read moreElectrification work over 2 lane rob 34a cheoki in distt. prayagraj
Electrification work over 2 lane rob 34a cheoki in distt. prayagraj&#x0d under construction by bcu prayagraj
Read moreElectrification work over 2 lane rob rob 40 no gomti in distt. prayagraj
Electrification work over 2 lane rob rob 40 no gomti in distt. prayagraj&#x0d under construction by bcu prayagraj
Read moreof your Industry type