Tender Details
Particulars | Details |
---|---|
Title |
Chimney (Including Piling) For Fgd System Of Unit 2 At 3x660 Mw Barh Stpp
|
Description |
Construction Of 01 No 150 Meter High Reinforced Concrete Single Steel Flue Chimney (Including Piling)
With Borosilicate Glass Block Lining And Other Incidentals Works All Complete For Fgd System Of Unit 2 At
3x660 Mw Barh Stpp Stage I, Bihar.
|
Organisation | Bharat Heavy Electricals Limited (BHEL) |
Tender Id | 2023_BHEL_27707_1 |
Reference Number |
PSER_SCT_BAR_C2246_23 |
Tender Fee | 0 |
EMD | 66.4 Lakh |
Tender Value | |
Place | ONLINE |
Link | https://eprocurebhel.co.in |
Start Date | August 22, 2023 14:30 |
End Date |
16/09/2023 ( Expired 626 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreSupply of advanced high energy linear accelerator system 01 unit
Supply of advanced high energy linear accelerator system 01 unit for the department of radiation oncology
Read moreRequest for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Request for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreHiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Hiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Read moreProviding and installation of new fire suppression system for 33 kv indoor vcb at 132 kv substation chudiyala.
Providing and installation of new fire suppression system for 33 kv indoor vcb at 132 kv substation chudiyala.
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreRfp for selection of operator for o and m of container freight station cfs facility of conware (punjab state container and warehousing corporation limited) at dronagiri node plot 2 sector 2 navi mumbai, nhava sheva, maharashtra on ppp mode
Rfp for selection of operator for o and m of container freight station cfs facility of conware (punjab state container and warehousing corporation limited) at dronagiri node plot 2 sector 2 navi mumbai, nhava sheva, maharashtra on ppp mode
Read moreRepair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure, earthings at lake line, heig line and pump house area and repair replacement an maintenance of ht switch gears, ht distribution system, 2 4 pole struc
Repair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure, earthings at lake line, heig line and pump house area and repair replacement an maintenance of ht switch gears, ht distribution system, 2 4 pole struc
Read moreRepair replacement and maintenance of ht switch gears, ht distribution system, 2/4 pole structure earthings ht cable and transformers at trisul line, chq, signal centre, 3tb under 1eme centre area and repair replacement maintenance of ht switch ge
Repair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure earthings ht cable and transformers at trisul line, chq, signal centre, 3tb under 1eme centre area and repair replacement maintenance of ht switch ge
Read moreof your Industry type