Tender Details

Particulars Details
Title
Repairing/ Replacement Of Carrying Idler Frame Along With Replacement Of Idler Sets For Unit C 1 And C 2 Belt Conveyor At Moonidih Coal Washery.
Description
Repairing/ Replacement Of Carrying Idler Frame Along With Replacement Of Idler Sets For Unit C 1 And C 2 Belt Conveyor At Moonidih Coal Washery.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_326519_1
Reference
Number
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1442
Tender Fee 0
EMD 2600
Tender Value -
Place MOONIDIH WASHERY
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338439

Start Date January 23, 2025 14:30
End Date
Expired 30/01/2025

Expired 623 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery

Repair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery

Read more
Ichp-replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in conveyor-49

Ichp-replacement of worn out and damaged portions of carrying idler frames and replacement of worn out stringer channel assembly in conveyor-49

Read more
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.

Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.

Read more
Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery

Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery

Read more
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.

Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.

Read more
Repairing/rewinding of 02 nos. 12.5 hp submersible pump sets and replacement of damaged pipeline in water supply system at dugda coal washery.

Repairing/rewinding of 02 nos. 12.5 hp submersible pump sets and replacement of damaged pipeline in water supply system at dugda coal washery.

Read more
Dismantling, transportation, installation and extension of 1000 mm wide gate belt conveyor along 71lwest from 71 l,/2dip to 43 d of the depillaring panel cmp -5 and pony belt from 19 r/71l to 19r/67l,along with the 1000 mm wide gate belt conveyer

Dismantling, transportation, installation and extension of 1000 mm wide gate belt conveyor along 71lwest from 71 l,/2dip to 43 d of the depillaring panel cmp -5 and pony belt from 19 r/71l to 19r/67l,along with the 1000 mm wide gate belt conveyer

Read more
Replacement of chlorinators of 40 kg/hr capacity and booster pump sets along with accessories and allied work at chlorinator room, chemical section, bhandup complex

Replacement of chlorinators of 40 kg/hr capacity and booster pump sets along with accessories and allied work at chlorinator room, chemical section, bhandup complex.

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
1700004546 roller carrier sl 380mm 1050bw,1700004541 roller impact l380,1700004547 roller return for 1050mm belt,1700004533 roller carrier sl 465mm 1200bw,1700004535 roller impact sl470mm 1200bw,1700004521 roller return 1500bw sl 1700mm,1700004576 idler carrying,1700004610 roller impact 1050 bw 3,1700004528 roller carrier 530mm 1350bw,1700004612 roller return idler 1076 belt feeder, sleeve length 2700mm,1700004515 roller 1200mm bw,1700004594 roller impact 1200 bw,1700004526 roller return complete assy 10 deg v type 1500mm,1700004577 roller return 10 deg sl 625 mm 1050 bw,1700004537 roller return v type 10 deg 1200 bw

1700004546 roller carrier sl 380mm 1050bw,1700004541 roller impact l380,1700004547 roller return for 1050mm belt,1700004533 roller carrier sl 465mm 1200bw,1700004535 roller impact sl470mm 1200bw,1700004521 roller return 1500bw sl 1700mm,1700004576 idler carrying,1700004610 roller impact 1050 bw 3,1700004528 roller carrier 530mm 1350bw,1700004612 roller return idler 1076 belt feeder, sleeve length 2700mm,1700004515 roller 1200mm bw,1700004594 roller impact 1200 bw,1700004526 roller return complete assy 10 deg v type 1500mm,1700004577 roller return 10 deg sl 625 mm 1050 bw,1700004537 roller return v type 10 deg 1200 bw

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise