Upgradation Of 66 Kv Substation Mananthavady To 110 Kv Level Providing Earthmat
|
Description |
Providing Earthmat Earth Work,Excavation By Means Of Men/ Machines,Cutting,Bending Ms Rodes,Laying Earthmat Of Required Sizes/As Per Drawing,Drilling Holes And Driwing Down,Welding Joints For Mat Nodal Points ,Ground With Main Electrodes.Refilling
|
Organisation | Kerala State Electricity Board | State Govt. and UT |
Tender Id | 2024_KSEB_710454_1 |
Reference Number |
ET-TSD 04/2024-25/29-11-2024 |
Tender Fee | 5900 |
EMD | 50000 |
Tender Value | |
Place | MANANTHAVADY SUBSTATION |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1115697 |
Start Date | December 03, 2024 15:30 |
End Date |
13/12/2024 ( Expired 176 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreUpgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Upgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreof your Industry type