Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cutting Grubbing And Removal Of Lantana At Beda Khater Purmandal Samba Capex
|
| Description |
Cutting Grubbing And Removal Of Lantana At Beda Khater Purmandal Samba Capex.
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_FD_216262_1 |
|
Reference Number |
14 of 2023-24 |
| Tender Fee | 600 |
| EMD | 2070 |
| Tender Value | - |
| Place | DFO Research Forest Division Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | June 12, 2023 23:30 |
| End Date |
Expired
14/07/2023
Expired 1187 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation of eco park at purmandal in purmandal forest range of samba forest divisions
See enit
Read moreRepair and renovation of range office purmandal in purmandal forest range of samba forest division
See enit
Read moreConstruction of st (g and b) girls hostel near aiims, district samba (under ut capex budget).
Please refers to boq
Read moreCutting levelling, filling and fencing playground at ups suranga under district capex budget 2026-27 yss sector
Boq
Read moreCustom bid for services - tree pruning cutting removal of dangerous branches at blast furnace unit kiocl limited panambur mangalore
Custom bid for services - tree pruning cutting removal of dangerous branches at blast furnace unit kiocl limited panambur mangalore
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreCutting/grubbing/ removal of bush/lantana/ obnoxious weeds at co. 1/r in ramnagar wildlife sanctuary
Cutting/grubbing/ removal of bush/lantana/ obnoxious weeds at co. 1/r in ramnagar wildlife sanctuary
Read moreCutting/grubbing/ removal of bush/lantana/ obnoxious weeds at co. 4/r in ramnagar wildlife sanctuary
Cutting/grubbing/ removal of bush/lantana/ obnoxious weeds at co. 4/r in ramnagar wildlife sanctuary
Read moreCutting/grubbing/ removal of bush/lantana/ obnoxious weeds at co. 4/r in ramnagar wildlife sanctuary
Cutting/grubbing/ removal of bush/lantana/ obnoxious weeds at co. 4/r in ramnagar wildlife sanctuary
Read moreof your Industry type