Tender Details

Particulars Details
Title
Tentage Arrangement And Associated Work
Description
Tentage Arrangement And Associated Work
Organisation VC-G.B. Pant University of Agriculture and Technology | State Govt. and UT
Tender Id 2025_GBPUA_79642_1
Reference
Number
GBPU/SPO/Tender/585 Dated 28-01-2025
Tender Fee 2360
EMD 2 Lakh
Tender Value
Place GBPUAT,Pantnagar,Uttarakhand
Link https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=94995
Start Date January 28, 2025 22:30
End Date

04/02/2025 ( Expired 111 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tower package tw04

Tower package tw04 for rohtang pass portion i.e. marhi khoksar section of 350 kv hvdc pang kaithal line and sissu khoksar and marhi solang valley section of 350 kv hvdc pang kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw leh kaithal transmission corridor

Read more
Transmission line tower package tw01

Transmission line tower package tw01 for pang to sarchu portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor).

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line

Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Tower package tw05 (solang valley-sundernagar )

Tower package tw05(i) solang valley-sundernagar (part-i) section of 350 kv hvdc pang-kaithal line (ii) solang valley-sundernagar (part-ii) section of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work

Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work

Read more
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise