Tender Details

Particulars Details
Title
Upgradation Of Divisional Office Complex By Way Of Replacement Of Rotten Glazed/Wire Shutters And Frames Of Doors And Windows Of Social Forestry Division Poonch Under Capex 2023 24.
Description
As Per The Specifications Of Nit And Bo Q.
Organisation Government of Jammu and Kashmir
Tender Id 2023_FD_228583_1
Reference
Number
e-NIT No. 19 of 2023-24 (Poonch) dated 02-09-2023
Tender Fee 500
EMD 2000
Tender Value -
Place O/o the Regional Director, Social Forestry Jammu
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date September 04, 2023 14:30
End Date
Expired 14/09/2023

Expired 1125 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Upgradation of divisional office complex poonch by way of replacement of rotten glazed/wire guaze shutters frames of doors and windows

Upgradation of divisional office complex poonch by way of replacement of rotten glazed/wire guaze shutters frames of doors and windows

Read more
Upgradation of dfo residential quarter at poonch by way of replacement of rotten glazed/wire guaze shutters frames of doors and windows

Upgradation of dfo residential quarter at poonch by way of replacement of rotten glazed/wire guaze shutters frames of doors and windows

Read more
Repair maint to panelled shutters glazed shutters upvc doors and windows wiremesh and other electrical connected works in zone a and b area under ge i gos

Repair maint to panelled shutters glazed shutters upvc doors and windows wiremesh and other electrical connected works in zone a and b area under ge i gos

Read more
R & m of t/ship (repair of doors, windows & frames

1)wood work qty: 50 sq 2)wood work qty: 50 sq 3)wood work qty: 100 me 4)wood work qty: 900 ea 5)wood work qty: 1200 ea 6)wood work qty: 800 ea 7)wood work qty: 1200 ea 8)wood work qty: 600 ea 9)wood work qty: 50 ea 10)wood work qty: 70 ea

Read more
R & m of t/ship (repair of doors, windows & frames

1)wood work qty: 100 me 2)wood work qty: 900 ea 3)wood work qty: 1200 ea 4)wood work qty: 800 ea 5)wood work qty: 1200 ea 6)wood work qty: 600 ea 7)wood work qty: 50 ea 8)wood work qty: 70 ea 9)wood work qty: 20 ea 10)wood work qty: 100 ea

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise