Tender Details

Particulars Details
Title
Removal And Disposal Of Flood Materials Constituting Muck /Silt /Stone /Pebbles /Boulders Etc. Deposited At Upstream Of Intake At Cofferdam Due To Heavy Flood In Bhaba Khad During Monsoon 2023.
Description
Removal And Disposal Of Flood Materials Constituting Muck /Silt /Stone /Pebbles /Boulders Etc. Deposited At Upstream Of Intake At Cofferdam Due To Heavy Flood In Bhaba Khad During Monsoon 2023.
Organisation HPSEBL | State Govt. and UT
Tender Id 2024_HPSEB_85159_1
Reference
Number
HPSEBL/CMD/WK-24/2023-24-20
Tender Fee 590
EMD 4974
Tender Value
Place Kafnoo
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=126719
Start Date February 05, 2024 23:30
End Date

12/02/2024 ( Expired 484 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repair and maintenance of swtp at salema by lifting, lowering of v.t pump motor excavation and cleaning of deposited earth, sand, silt, clay etc from intake well, under dws sub-division salema during the year 2025-26

Repair and maintenance of swtp at salema by lifting, lowering of v.t pump motor excavation and cleaning of deposited earth, sand, silt, clay etc from intake well, under dws sub-division salema during the year 2025-26

Read more
General pre monsoon 2025 2026urgent removal of floating material and debristo clear the blockage near irupathettilkadavubridge across achenkovil river in pallippadpanchayath of harippad lac

Removing all the organic inorganic , plastic and silt materials deposited near the&amp#x0d structures in rivers at different places during the flood using hydraulic excavators

Read more
General premonsoon work 2025 26 emergency removal of accumulated debris water weeds and plastic materials at mangotta in pamba river near mp palam connectingcheruthana and edathua panchayath

Removing all the organic inorganic plastic and silt materials deposited near the&amp#x0d structures in rivers at different places during the flood using hydraulic excavators

Read more
Removal of flood material

Removal and disposal of flood material constituting muck silt stone pebbles boulders etc deposited at cofferdam of svp bhaba

Read more
Removal of muck ,debris,boulder,plastering, micro concreting removal of silt,debris from intake,forebay and power channel etc at lingti power house under cmd,bhabanagar.

Removal of muck,debris,boulder,plastering, micro concreting removal of silt,debris from intake,forebay and power channel etc at lingti power house under cmd,bhabanagar.

Read more
Removal and disposal of flood materials constituting muck/silt/stone

Removal and disposal of flood materials constituting muck/silt/stone/pebbels/boulders etc deposited in front of intake gate and under sluice gate svp bhaba.

Read more
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0

Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.

Read more
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from

Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise