Tender Details

Particulars Details
Title
Removal And Disposal Of Flood Materials Constituting Muck /Silt /Stone /Pebbles /Boulders Etc. Deposited At Upstream Of Intake At Cofferdam Due To Heavy Flood In Bhaba Khad During Monsoon 2023.
Description
Removal And Disposal Of Flood Materials Constituting Muck /Silt /Stone /Pebbles /Boulders Etc. Deposited At Upstream Of Intake At Cofferdam Due To Heavy Flood In Bhaba Khad During Monsoon 2023.
Organisation HPSEBL | State Govt. and UT
Tender Id 2024_HPSEB_85159_1
Reference
Number
HPSEBL/CMD/WK-24/2023-24-20
Tender Fee 590
EMD 4974
Tender Value
Place Kafnoo
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=126719
Start Date February 05, 2024 23:30
End Date

12/02/2024 ( Expired 435 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Read more
Providing of men, machinery, materials for execution of emergent works at site as per requirements due to breaches/ floods/ calamities/ encroachments removal etc. of martand canal (major/medium irrigation) for the year 2025-26 (m and r 2701).

Providing of men, machinery, materials for execution of emergent works at site as per requirements due to breaches/ floods/ calamities/ encroachments removal etc. of martand canal (major/medium irrigation) for the year 2025-26 (m and r 2701).

Read more
Removal and disposal of silt/ sand and small size gravels, debris etc. from the pathakheda nallah and nallah between sector no. 3 to 7 joining pathakheda nallah at stps, mppgcl, sarni.

Removal and disposal of silt/ sand and small size gravels, debris etc. from the pathakheda nallah and nallah between sector no. 3 to 7 joining pathakheda nallah at stps, mppgcl, sarni.

Read more
Providing of men, machinery, materials for execution of emergent works at site as per requirements due to breaches/floods /calamities/encroachments removal etc. of irrigation sub-division bawan (minor irrigation) for the year 2025-26

Providing of men, machinery, materials for execution of emergent works at site as per requirements due to breaches /floods/calamities/ encroachments removal etc. of irrigation sub-division bawan (minor irrigation) for the year 2025-26

Read more
Providing men, machinery, materials for execution of emergent works at site as per requirement due to siltation/ damages/ breaches/ floods/ calamities/encroachment removal (if any) etc for irrigation sub division khrew for the year 2025-26

Providing men, machinery, materials for execution of emergent works at site as per requirement due to siltation/ damages/ breaches/ floods/ calamities/encroachment removal (if any) etc for irrigation sub division khrew for the year 2025-26

Read more
Desilting of khandepar river 300 m upstream and downstream of intersection of udnai river along with desilting of nallah joining udnai river at dabal bridge in nirancal village of ponda taluka to overcome inundation flooding durning heavy monsoon.

Desilting of khandepar river 300 m upstream and downstream of intersection of udnai river along with desilting of nallah joining udnai river dabal bridge in nirancal village of ponda taluka to overcome inundation flooding during heavy monsoon.

Read more
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0

Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.

Read more
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from

Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.

Read more
Repair with protection work of damaged parts at km. 2 of majhila gauhaniya khiriya road due to heavy rain and flood in distt. shahjahanpur. (fin year 2024-25)

Repair with protection work of damaged parts at km. 2 of majhila gauhaniya khiriya road due to heavy rain and flood in distt. shahjahanpur. (fin year 2024-25)

Read more
Ktps-v-cam-transportation of material, tp, ms erw pipes, various scrap material, ash, coal, silt debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise