Tender Details

Particulars Details
Title
Raking Out Joints In Lime Or Cement Mortar And Preparing The Surface For,Dismantling Roofing Includ
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2023/B/4090962
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date November 22, 2023 00:10
End Date
Expired 02/12/2023

Expired 1047 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 K L Son Enterprise - 02-12-2023 16:47:00 MII MSE Qualified
2 Pale Enterprises - 02-12-2023 00:16:52 MII MSE Qualified
3 TG ENTERPRISES - 02-12-2023 16:21:01 MII MSE Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 Pale Enterprises(MSE,MII)( MSE Social Category:SC ) Item Categories : Raking out joints in lime or cement mortar and preparing the surface for,Dismantling roofing includ 3500000.00 L1
2 K L Son Enterprise (MSE,MII)( MSE Social Category:General ) Item Categories : Raking out joints in lime or cement mortar and preparing the surface for,Dismantling roofing includ 3652260.00 L2
3 TG ENTERPRISES (MSE,MII)( MSE Social Category:General ) Item Categories : Raking out joints in lime or cement mortar and preparing the surface for,Dismantling roofing includ 3882805.00 L3
Similar Tenders
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Providing second class burnt brick masonry with conventional l s type bricks in cement mortar 1 6 in superstructure including striking joints raking out joints watering andscaffolding etc complate

Providing second class burnt brick masonry with conventional l s type bricks in cement mortar 1 6 in superstructure including striking joints raking out joints watering andscaffolding etc complate

Read more
Urgent repair of raking out joints and pointing on terrace area around of room no 231/232/233 at dap building, delhi

Urgent repair of raking out joints and pointing on terrace area around of &#x0d room no 231/232/233 at dap building, delhi

Read more
Making spetic tank in back of survey office, raking out joints and renewing of glass panes of survey room at gokul ocm under murpar sub area of umrer area.

Making spetic tank in back of survey office, raking out joints and renewing of glass panes of survey room at gokul ocm under murpar sub area of umrer area.

Read more
Making spetic tank in back of survey office, raking out joints and renewing of glass panes of survey room at gokul ocm under murpar sub area of umrer area.

Making spetic tank in back of survey office, raking out joints and renewing of glass panes of survey room at gokul ocm under murpar sub area of umrer area.

Read more
Dismantling and replastering of the external wall surface and repairs to expansion joints, plumbing lines etc in chemical science building iisc, bangalore

Dismantling and replastering of the external wall surface and repairs to expansion joints, plumbing lines etc in chemical science building iisc, bangalore

Read more
Jhagroli , buchawas , group of 2 no. of habitations annual mtc.works for water supply. cleaning grass,raking out joints and repointing od side lining of ss tank and repair of other structure like filter bed ,hlt and all other works contingent thereto

Jhagroli , buchawas , group of 2 no. of habitations annual mtc.works for water supply. cleaning grass,raking out joints and repointing od side lining of ss tank and repair of other structure like filter bed ,hlt and all other works contingent thereto

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise