Tender Details
Particulars | Details |
---|---|
Title |
Dismantling Of One Poney Belt Drive Head From E 7 Bg/4th Dip Jn.And Transportation Of One Pony Belt Accessories Such As Gear Box, Gib Drum, Motor, Er Etc.
|
Description |
Dismantling Of One Poney Belt Drive Head From E 7 Bg/4th Dip Jn.And Transportation Of One 
Pony Belt Accessories Such As Gear Box, Gib Drum, Motor, Er Etc.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_320170_1 |
Reference Number |
BCCL/WJA/MND/SUR/2024-25/47 |
Tender Fee | 0 |
EMD | 4022 |
Tender Value | |
Place | Moonidih Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331887 |
Start Date | October 29, 2024 18:30 |
End Date |
08/11/2024 ( Expired 184 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Loading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.
Loading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.
Read moreDismantling of one pony belt drivehead from e-8 b/g,transportation and installation thereof pony belt drivehead in e-9 b/g face of xvi(b) seam at 500mh in moonidih colliery, w.j. area
Dismantling of one pony belt drivehead from e-8 b/g,transportation and installation thereof pony belt drivehead in e-9 b/g face of xvi(b) seam at 500mh in moonidih colliery, w.j. area
Read moreDismantling, repairing and replacement of bearing and alignment of gear box model gs-100 installed at drive drum of unit 701 conveyor belt at moonidih coal washery.
Dismantling, repairing and replacement of bearing and alignment of gear box model gs-100 installed at drive drum of unit 701 conveyor belt at moonidih coal washery.
Read more(a) complete repairing of bishwa make gear box 75kw ratio 30/1 and (b) repairing of input shaft and pinion 26 teeth and 81 teeth bishwa make gearbox 75kw ratio 30/1 for belt drive head drum of feeder breaker no-1, phularitand, amp colliery.
(a) complete repairing of bishwa make gear box 75kw ratio 30/1 and (b) repairing of input shaft and pinion 26 teeth and 81 teeth bishwa make gearbox 75kw ratio 30/1 for belt drive head drum of feeder breaker no-1, phularitand, amp colliery.
Read moreExtension of one no 1000 mm width pvc belt conveyor for a length of 530 meters with complete drive head along 2l from 59 dip to 71 dip in r v seam of mic jhanjra project colliery.
Extension of one no 1000 mm width pvc belt conveyor for a length of 530 meters with complete drive head along 2l from 59 dip to 71 dip in r v seam of mic jhanjra project colliery.
Read moreDismantling, transportation, installation, commissioning n trial including necessary fabrication jobs including civil works of one no. 1200 mm width pvc belt conveyor for a length of 80 meters with complete drive head along 48 dip from 0l to -2l
Dismantling, transportation, installation, commissioning n trial including necessary fabrication jobs including civil works of one no. 1200 mm width pvc belt conveyor for a length of 80 meters with complete drive head along 48 dip from 0l to -2l
Read moreTransportation of 60lbs track line 100mt from d-17 and d-16 panel to e-8 tg/5th dip junction of xvi (b) seam dismantling ,transporting of two no 60lbs crossing from d-17 tg to d-18 bg
Transportation of 60lbs 
 track line 100mt from d-17 
 and d-16 panel to e-8 
 tg/5th dip junction of xvi 
 (b) seam dismantling 
 ,transporting of two no 
 60lbs crossing from d-17 
 tg to d-18 bg
Read moreRepairing/ strengthening of base frame of head drum, motor and gear box for unit 702 conveyor belt at moonidih coal washery
Repairing/ strengthening of base frame of head drum, motor and gear box for unit 702 conveyor belt at moonidih coal washery
Read moreDismantling, repairing and replacement of bearing and intermediate pinion of gear box (model gs-100) installed at drive end along with alignment of drive drum of unit 801-a and c-1 conveyor belt at moonidih coal washery.
Dismantling, repairing and replacement of bearing and intermediate pinion of gear box (model gs-100) installed at drive end along with alignment of drive drum of unit 801-a and c-1 conveyor belt at moonidih coal washery.
Read moreTransportation and changing of one nos. gear box and one no. motor, replacement of worn out fgc-11 geared coupling of both the drums of 1400 3rd belt conveyor in main incline at mic, jhtransportation and changing of one nos. geaanjra project colliery
Transportation and changing of one nos. gear box and one no. motor, replacement of worn out fgc-11 geared coupling of both the drums of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Read moreof your Industry type