Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Materials For Construction Of Pandhan Road From Yavatmal Amaravati Road To Shri. Raju Chirde Te Ramesh Sune Farm Km 1/00 To Km 1/730
|
Description |
Supply Of Materials For Construction Of Pandhan Road From Yavatmal Amaravati Road To Shri. Raju Chirde Te Ramesh Sune Farm Km 1/00 To Km 1/730
|
Organisation | RDD-CEO-YAVATMAL | State Govt. and UT |
Tender Id | 2024_YAVAT_1045377_1 |
Reference Number |
NIT/06/01/MATO/LONI/2023-24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | At.G.P.Loni Tq.Ner Dist.Yavatmal |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1825697 |
Start Date | June 26, 2024 23:00 |
End Date |
03/07/2024 ( Expired 312 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreIe services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConsultancy services for authority engineer for supervision of construction of two lane with paved shoulders for gowrelly to valigonda section from km 0.000 to km 41.920 green field alignment of nh 930p in the state of telangana on epc mode
Consultancy services for authority engineer for supervision of construction of two lane with paved shoulders for gowrelly to valigonda section from km 0.000 to km 41.920 green field alignment of nh 930p in the state of telangana on epc mode
Read moreConstruction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Read moreSupply of 1) karpooravalli banana, 2) malai vazhaikkai (mountain banana) 3) kudagu banana for the fasali 1435 (from the date of order to 30.06.2026) for the panchamirtham production unit of arulmigu dhandayuthapani swamy temple, palani, dindigul dist
Supply of 1) karpooravalli banana, 2) malai vazhaikkai (mountain banana) 3) kudagu banana for the fasali 1435 (from the date of order to 30.06.2026) for the panchamirtham production unit of arulmigu dhandayuthapani swamy temple, palani, dindigul dist
Read moreSupply of 1/2kg capacity ever-silver vessel with lid and spoon size as per in the tender conditions having 304 food grade quality for arulmigu dandayuthapani swami temple, palani for the year fasali 1435 (from the date of order to 30.06.2026).
Supply of 1/2kg capacity ever-silver vessel with lid and spoon size as per in the tender conditions having 304 food grade quality for arulmigu dandayuthapani swami temple, palani for the year fasali 1435 (from the date of order to 30.06.2026).
Read moreof your Industry type