Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Procurement Opportunity: Top & Bottom Half Casing Assembly 🛠️ Mahanadi Coalfields Limited, Under The Ministry Of Coal, Is Seeking Bids For The Supply Of Top & Bottom Half Casing Assembly With Fasteners, Part Number Staba01. 🗓️ Submission Deadline: May 13, 2024, 12:00 Pm Interested Bidders Should Provide Detailed Technical Specifications, Pricing, And Delivery Schedules For This Cast Iron Component. Keywords: Mahanadi Coalfields Limited, Top & Bottom Half Casing Assembly, Fasteners, Cast Iron, Procurement, Government Tender| Particulars | Details |
|---|---|
| Title |
Top & Bottom Half Casing Assembly With Fasteners Of Cast Iron Part No Staba01
|
| Description |
|
| Organisation | MAHANADI COALFIELDS LIMITED | Ministry of Coal |
| Tender Id | GEM/2024/B/4878849 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 22, 2024 16:54 |
| End Date |
Expired
13/05/2024
Expired 779 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | RADIANT DISTRIBUTORS | Make : KIRLOSKAR BROTHERS LIMITED Model : KIRLOSKAR 6UP4 TOP & BOTTOM ASSEMBLY CI MCL Title : KIRLOSKAR 6UP4 UPPER & LOWER CASING CI | 13-05-2024 09:23:08 | MII | Qualified |
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | RADIANT DISTRIBUTORS(MII) | Item Categories : TOP & BOTTOM HALF CASING ASSEMBLY WITH FASTENERS OF CAST IRON PART NO- STABA01 | 244640.18 | L1 |
Contract Details
- Contract Status:
- Order Accepted
- Seller:
- RADIANT DISTRIBUTORS
- Buyer Designation:
- BAIDYANATH SAHOO CM MM
- Buying Mode:
- Bid/RA
- Contract Date:
- 2024-08-14 17:21:00 +0530
- Contract Amount:
- 244640.18
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| KIRLOSKAR 6UP4 UPPER & LOWER CASING CI | KIRLOSKAR BROTHERS LIMITED | KIRLOSKAR 6UP4 TOP & BOTTOM ASSEMBLY CI MCL | 1 | ₹ 244640.180 |
Repairing of stick assembly and lhs final drive assembly along with its foundation of ck300 shovel sl. no. 737 deployed at topa ocp, kuju area.
Repairing of stick assembly and lhs final drive assembly along with its foundation of ck300 shovel sl. no. 737 deployed at topa ocp, kuju area.
Read moreDevelopment of ultra violet (uv) lens optics along with opto-mechanical assembly
Development of ultra violet (uv) lens optics along with opto-mechanical assembly
Read moreSupply of 18 ghz rf cable assembly with n-male at both sides
Supply of 18 ghz rf cable assembly with n-male at both sides
Read moreRenewal of pan no 1 6 and 7 top save and inner shell plate replacement work
Renewal of pan no 1 6 and 7 top save and inner shell plate replacement work
Read moreSupply of terminal studs with housing assembly of 420kv, 3150a, siemens make hcb isolator installed at csctpp 400kv switchyard, chhabra
Supply of terminal studs with housing assembly of 420kv, 3150a, siemens make hcb isolator installed at csctpp 400kv switchyard, chhabra
Read moreSingle core flexible elastomeric cable size 3 sq. mm, 750 volts grade as per rdso specification no. e-14/01 (part-i),rev.2,1993 with amendment no.4 of sept- 2003 or latest .
For complete deion and other details, please refer to tender
Read moreIoh kit for valve model no. 3403-25-sb of rotex make as per rotex part no. 11zp25sb06003. make - rotex.
For complete deion and other details, please refer to tender
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreFireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Read moreProvn of septic tank and soakage well for 100 users at lkg (rr) and repair/replacement of solar lights in 10 ib at kg top and demolition of bldg no t-41 located at village- samote poonch under ge 881 ews
Provn of septic tank and soakage well for 100 users at lkg (rr) and repair/replacement of solar lights in 10 ib at kg top and demolition of bldg no t-41 located at village- samote poonch under ge 881 ews
Read moreof your Industry type