Tender Details

About Tender

⚡️electrical Engineering Procurement Opportunity At Central Coalfields Limited ⚡️ Central Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids For The Supply Of Essential Electrical Components For The Murpa Substation Under The Gm Unit Kuju Area. 🏭 📍 Location: Gm Unit Kuju The Procurement Includes: Single Line Diagram Boards Shutdown Procedure Boards Shock Treatment Information Display Boards 35 Nos. Earthing Boards 🗓️ Deadline: May 27, 2024, 6:55 Pm Bid Submission Is Free Of Cost, With An Emd Of Inr 4200. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Pricing, And Implementation Timelines. Keywords: Electrical Components, Murpa Substation, Central Coalfields Limited, Public Sector Undertaking, Bid, Procurement, Electrical Engineering, Gm Unit Kuju Area
Particulars Details
Title
Single Line Diagram Board,Shutdown Procedure Board, Shock Treatment Information Display Board,35 Nos. Earthing Board Of Murpa Substation Under Gm Unit Kuju Area.
Description
Single Line Diagram Board,Shutdown Procedure Board, Shock Treatment Information Display Board,35 Nos. Earthing Board Of Murpa Substation Under Gm Unit Kuju Area.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_308310_1
Reference
Number
GM (K)/EnM/eTender/24-25/24
Tender Fee 0
EMD 4200
Tender Value
Place GM UNIT KUJU
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319466
Start Date May 18, 2024 00:25
End Date

27/05/2024 ( Expired 329 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Complete repairing and rewinding of 210 nos. ceiling fan under gm unit, nk area

Complete repairing and rewinding of 210 nos. ceiling fan under gm unit, nk area

Read more
Erection of 300mtrs of 50mm dia and 47mtr of 25mm dia u-pvc pipeline for daily watering of 47 nos. of earth-pits installed at colony sub-station,10no. substation and enm workshop of sarubera project under kuju area.

Erection of 300mtrs of 50mm dia and 47mtr of 25mm dia u-pvc pipeline for daily watering of 47 nos. of earth-pits installed at colony sub-station,10no. substation and enm workshop of sarubera project under kuju area.

Read more
Annual maintenance and operation of 02 nos. 11 tone centralized air conditioner plant and routine checking the same in one shift installed at computer building (agm section) under gm unit, piparwar area for a period of 01 year.

Annual maintenance and operation of 02 &#x0d nos. 11 tone centralized air conditioner &#x0d plant and routine checking the same in one &#x0d shift installed at computer building (agm &#x0d section) under gm unit, piparwar area for a &#x0d period of 01 year&#x0d

Read more
Designing, printing and pasting of single line diagram at 220 kv ss and naming/numbering of 33 kv kocp and b(w)ocp feeders tower line at 220/33 kv grid substation, basundhara area. (2nd retender)

Designing, printing and pasting of single line diagram at 220 kv ss and naming/numbering of 33 kv kocp and b(w)ocp feeders tower line at 220/33 kv grid substation, basundhara area. (2nd retender)

Read more
Providing quarry boulder fencing wall for 02 n 16 b quarry mine at ara and quarry boulder toe wall along sarubera village road at sarubera under gm unit of kuju area.

Providing quarry boulder fencing wall for 02 n 16 b quarry mine at ara and quarry boulder toe wall along sarubera village road at sarubera under gm unit of kuju area.

Read more
Comprehensive annual maintenance contract for 145 nos. split and window type air conditioners along with voltage stabilizers installed at different places (detailed in deion of work) under gm unit, nk area for a period of one year

Comprehensive annual maintenance contract for 145 nos. split and window type air conditioners along with voltage stabilizers installed at different places (detailed in deion of work) under gm unit, nk area for a period of one year

Read more
Installation of 1.6 mva power transformer and 500kva 3.3kv/440volt transformer with bus bar, earthing arrangement , renovation of 440volt oh for providing power to movable mobile crusher at coal stock at karma main substation under kuju area

Installation of 1.6 mva power transformer and 500kva 3.3kv/440volt transformer with bus bar, earthing arrangement , renovation of 440volt oh for providing power to movable mobile crusher at coal stock at karma main substation under kuju area

Read more
Replacement of damaged pipeline from pokharia to atal colony and repairing of water supply line in atal colony under gm unit, argada area.

Replacement of damaged pipeline from pokharia to atal colony and repairing of water supply line in atal colony under gm unit, argada area.

Read more
Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.

Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.

Read more
Maintenance and repairing at site of buchloz relay alarm bell system of 02 nos of 1mva,11kv/3.3kv power transformer at main substation and mine substation of karma project under kuju area.

Maintenance and repairing at site of buchloz relay alarm bell system of 02 nos of 1mva,11kv/3.3kv power transformer at main substation and mine substation of karma project under kuju area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise