Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Set Of Asbestos Dry Rope
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106355432 |
|
Reference Number |
41245062A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Bhubaneswar |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106355432/viewNitPdf_4583218.pdf |
| Start Date | May 24, 2024 23:13 |
| End Date |
Expired
14/06/2024
Expired 806 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of dry grass to sowthadka sri mahaganapathi temple, kokkada belthngady taluk.
Supply of dry grass to sowthadka sri mahaganapathi temple, kokkada belthngady taluk.
Read moreDry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27
Dry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27
Read moreReplacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 ahp
Replacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 ahp
Read moreSupply, installation testing and commissioning of dg set
Supply, installation testing and commissioning of dg set
Read moreE516324-hs15250- set of bearing assy components (10 items)
E516324-hs15250- set of bearing assy components (10 items)
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Read moreof your Industry type