Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bend, 90 Deg. With Copling, Size: 1",Bend, 90 Deg. With Coupling, Size: 1",Bend, 90 Deg. With Coupl
|
| Description |
|
| Organisation | OIL INDIA Limited | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2025/B/6204564 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | June 03, 2025 22:26 |
| End Date |
Expired
26/06/2025
Expired 434 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Tempo travellers 14 plus 1 seater along with driver and gps tracker for mysuru tli-1 section
Providing vehicle services of tempo travellers (14 plus 1) seater along with driver and gps tracker for maintenance of transmission lines coming under mysuru tli-1 section of hootagally operation division, mysuru transmission zone on hire basis
Read moreSupply, installation, testing and commissioning of controllers with complete accessories, including 1 year comprehensive maintenance
Supply, installation, testing and commissioning of automatic on/off street light controller with timer and complete accessories, including 1 year comprehensive maintenance
Read moreTempo travellers 14 plus 1 seater along with driver and gps tracker for shivanasamudra tli section
Providing vehicle services of tempo travellers (14 plus 1) seater along with driver and gps tracker for maintenance of transmission lines coming under shivanasamudra section of mandya operation division, mysuru transmission zone on hire basis
Read moreTempo travellers 14 plus 1 seater along with driver and gps tracker for mandya tli section
Providing vehicle services of tempo travellers (14 plus 1) seater along with driver and gps tracker for maintenance of transmission lines coming under mandya section of mandya operation division, mysuru transmission zone on hire basis
Read moreSupply, installation, testing and commissioning of particle size analyzer with zeta potential and accessories under pradhan mantri uchchatar shiksha abhiyan scheme at karnatak university, dharwad
Supply, installation, testing and commissioning of particle size analyzer with zeta potential and accessories under pradhan mantri uchchatar shiksha abhiyan pm-usha scheme at karnatak university, dharwad
Read moreTempo travellers 14 plus 1 seater along with driver and gps tracker for kr nagara tli section
Providing vehicle services of tempo travellers (14 plus1) seater along with driver and gps tracker for maintenance of transmission lines coming under k.r.nagara tli section of hootagally operation division, mysuru transmission zone on hire basis
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreProviding services of experts along with testing equipment for on-line safety valves pressure setting in boilers of rtps units-1 to 8 for the year 2026-27
Providing services of experts along with testing equipment for on-line safety valves pressure setting in boilers of rtps units-1 to 8 for the year 2026-27
Read moreDeepening and widening of nala with jungle clearance at sy.no-227 to 1 and sy.no-40,41 & others of sonna village including constructio of cd at sy.no .63 of sonna village of jewargi of taluka, district kalaburgi.
Deepening and widening of nala with jungle clearance at sy.no-227 to 1 and sy.no-40,41 & others of sonna village including constructio of cd at sy.no .63 of sonna village of jewargi of taluka, district kalaburgi.
Read moreof your Industry type