Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Upgradation And Development Of 1 Nos. At Grade Junction To Grade Separator Underpass Flyover Structure Of Jaipur Rajasthan 200 Feet Bypass Junction Project At Km. 273.600 (Delhi Jaipur Ajmer Expressway) In Rajasthan On Epc Mode
|
Description |
Upgradation And Development Of 1 Nos. At Grade Junction To Grade Separator Underpass Flyover Structure Of Jaipur Rajasthan 200 Feet Bypass Junction Project At Km. 273.600 (Delhi Jaipur Ajmer Expressway) In Rajasthan On Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 20000 |
EMD | 1.53 Crore |
Tender Value | |
Place | NHAI HQ |
Link |
AAAAAAAAAA Login to view |
Start Date | May 27, 2025 18:30 |
End Date |
11/07/2025 ( 23 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of flyover at chainage km 165.020 (pastikudi) on nh-26 including approaches in the state of odisha on epc mode.
Construction of flyover at chainage km 165.020 (pastikudi) on nh-26 including approaches in the state of odisha on epc mode.
Read moreUpgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Upgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreConstruction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Construction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreFour laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana
Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana
Read moreCs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call
Cs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call
Read moreDeep drilling, development and stabilization of (02 nos) 200 mm dia mini tube wells (on epc mode) by odex method
Deep drilling, development and stabilization of (02 nos) 200 mm dia mini tube wells (on epc mode) by odex method
Read moreof your Industry type