Tender Details

Particulars Details
Title
T.T. Water Connection At Consumer End From Sector 31 To 63 Ram Darbar Phase Ii Chandigarh As Per Water Supply Byelaws Under The Charge Of Sde Mcph Sub Divn No.3 Chd
Description
T.T. Water Connection At Consumer End From Sector 31 To 63 Ram Darbar Phase Ii Chandigarh As Per Water Supply Byelaws Under The Charge Of Sde Mcph Sub Divn No.3 Chd
Organisation Municipal Corporation | State Govt. and UT
Tender Id 2025_MCC_86182_1
Reference
Number
MCPH3/2025/218
Tender Fee 1000
EMD 17613
Tender Value
Place Chandigarh
Link https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=105955
Start Date May 23, 2025 20:45
End Date

29/05/2025 ( Expired 8 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Providing and fixing of 16 inch m.s. pipe line in lieu of old cracked/ rusted rising main 16 inch c.i. pipe line catering t.t. water supply from sector 48 to 52, chandigarh under the jurisdiction of sde mcph sub division no.03, chandigarh

Providing and fixing of 16 inch m.s. pipe line in lieu of old cracked/ rusted rising main 16 inch c.i. pipe line catering t.t. water supply from sector 48 to 52, chandigarh under the jurisdiction of sde mcph sub division no.03, chandigarh

Read more
Emergent replacement of 500mm dia tt water damaged psc line with ms pipe line near light point 3 brd and ashadeep school sec.31 side sec.31/47 dividing road chd under the charge of sde mcph s/divn no.3, chd

Emergent replacement of 500mm dia tt water damaged psc line with ms pipe line near light point 3 brd and ashadeep school sec.31 side sec.31/47 dividing road chd under the charge of sde mcph s/divn no.3, chd

Read more
T.t. water connections at consumer end from sector 1 to 30 excluding the cost of material and all desired permissions from the concerned road department that are belongs to consumer as per water supply bye laws under the jurisdiction of sde mcph sub

T.t. water connections at consumer end from sector 1 to 30 excluding the cost of material and all desired permissions from the concerned road department that are belongs to consumer as per water supply bye laws under the jurisdiction of sde mcph sub

Read more
T.t. water connection at consumer end from sector 31 to 63 ram darbar phase ii chandigarh as per water supply byelaws under the charge of sde mcph sub divn no.3 chd

T.t. water connection at consumer end from sector 31 to 63 ram darbar phase ii chandigarh as per water supply byelaws under the charge of sde mcph sub divn no.3 chd

Read more
Replacement of 2 no 500mm i/d psc pipes supplying t.t. water at dividing road sector-27/30, sector-30b side on urgent basis under the jurisdiction of sde, mcph sub division no 7, chandigarh

Replacement of 2 no 500mm i/d psc pipes supplying t.t. water at dividing road sector-27/30, sector-30b side on urgent basis under the jurisdiction of sde, mcph sub division no 7, chandigarh

Read more
Providing and laying of 4 inch id di water supply line to overcome the problem of low pressure from house no.1285 to 1296 1 sector 30-b chd. under the charge of sde mcph sub division no.16 chandigarh. ch. to revenue head.

Providing and laying of 4 inch id di water supply line to overcome the problem of low pressure from house no.1285 to 1296 1 sector 30-b chd. under the charge of sde mcph sub division no.16 chandigarh. ch. to revenue head.

Read more
Dismantling / reconstruction of 31 nos. public toilets into aspirational toilets as per the guidelines of sbm urban 2.0 in various sectors i.e. 7,8,9,11,18,20,26, 28,27,47 and manimajra, chd sub work 12 nos. public toilets under mcph-3 chd

Dismantling / reconstruction of 31 nos. public toilets into aspirational toilets as per the guidelines of sbm urban 2.0 in various sectors i.e. 7,8,9,11,18,20,26, 28,27,47 and manimajra, chd sub work 12 nos. public toilets under mcph-3 chd

Read more
Supply installation and testing of 30kw 40hp capacity mud pump with 3 phase motor for taking water from jackwell and putting it in intake well having discharge of 540m3/4 and head of 8 10 meter complete work as per estimate and conditions

Supply installation and testing of 30kw 40hp capacity mud pump with 3 phase motor for taking water from jackwell and putting it in intake well having discharge of 540m3/4 and head of 8 10 meter complete work as per estimate and conditions

Read more
Providing and fixing of 12 inch sluice valve to solve the contaminated water problem in hallomajra and ram darbar along with other allied works under the charge of sde mcph 10 chd

Providing and fixing of 12 inch sluice valve to solve the contaminated water problem in hallomajra and ram darbar along with other allied works under the charge of sde mcph 10 chd

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise