Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dd Taloja Industrial Area. M And R To Street Lights In Taloja Indl. Area. Augmentation Of Highmast Fittings With Accessories To Smart Highmast At Taloja Indl. Area
|
| Description |
Dd Taloja Industrial Area. M And R To Street Lights In Taloja Indl. Area. Augmentation Of Highmast Fittings With Accessories To Smart Highmast At Taloja Indl. Area
|
| Organisation | Maharashtra Industrial Development Corporation | Chief Engineer (HQ) Mumbai Zone | Superintending Engineer E and M Comm. Mumbai | E and M Division Ambernath |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 10030 |
| EMD | 40000 |
| Tender Value | 39.97 Lakh |
| Place | Maharashtra |
| Link | Login to view |
| Start Date | September 29, 2026 18:30 |
| End Date |
Closing soon
13/10/2026
1 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Taloja industrial area...m and r to roads in taloja indl area providing rcc cover over the footpath openings along the main road in taloja indl area.
Taloja industrial area...m and r to roads in taloja indl area providing rcc cover over the footpath openings along the main road in taloja indl area.
Read moreAnnual running security cum maintenance of street lights and highmast for area illumination (with material and labour) at industrial area acharpura, district bhopal (m.p.)
Annual running security cum maintenance of street lights and highmast for area illumination (with material and labour) at industrial area acharpura, district bhopal (m.p.)
Read moreSupply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Supply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Read moreM and r to street lights in taloja indl area improving illumination of street lights at engineering zone in taloja indl area
M and r to street lights in taloja indl area improving illumination of street lights at engineering zone in taloja indl area
Read moreDd taloja industrial area...m and r to eds taloja indl area .... operation and maintenance of phase ii eds pump house in taloja indl area for one year.
Dd taloja industrial area...m and r to eds taloja indl area .... operation and maintenance of phase ii eds pump house in taloja indl area for one year.
Read moreTaloja indl. area.... emergency structural repairs....
Taloja industrial area.... railway over bridge constructed at gate 12 a at&#x0d navade.... emergency structural repairs of deck slab of span pr 11 and pr 12 s7 and&#x0d pr11 pr12 s8.
Read moreDd taloja industrial area...m and r to eds at taloja indl. area and ttc indl. area annual repairing of pumps at various locations at taloja phase i and ii and airoli eds pumping station. 2nd call
Dd taloja industrial area...m and r to eds at taloja indl. area and ttc indl. area annual repairing of pumps at various locations at taloja phase i and ii and airoli eds pumping station. 2nd call
Read moreDd taloja industrial area m and r to eds in taloja indl area providing of 22 kv ht panel along with tcmu at eds taloja phase-ii pumping station
Dd taloja industrial area m and r to eds in taloja indl area providing of 22 kv ht panel along with tcmu at eds taloja phase-ii pumping station
Read moreTaloja indl. area.... construction of rcc chambers
M and r to eds in taloja industrial area.... construction of rcc chambers on effluent&#x0d collection line in taloja industrial area.
Read moreTaloja indl. area.... maint. of drainage collection..
M and r to eds in taloja indl. area.... maintenance of drainage collection and disposal&#x0d main at taloja indl. area.
Read moreof your Industry type