Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Cpvc Pipe, Flange, Elbow, Coupler, Tee, Valve Etc. For Dm Plant And Ro Plant Under Tm 3, Ktps
|
Description |
Procurement Of Cpvc Pipe, Flange, Elbow, Coupler, Tee, Valve Etc. For Dm Plant And Ro Plant Under Tm 3, Ktps
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2024_WBPDC_780747_1 |
Reference Number |
WBPDCL/KTPS/NIT/E3107/24-25 |
Tender Fee | 0 |
EMD | 34900 |
Tender Value | |
Place | GM Building, KTPS, Mecheda, Purba Medinipur |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1729929 |
Start Date | December 23, 2024 16:30 |
End Date |
02/01/2025 ( Expired 146 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreConstruction of 3 tpd material recovery facility center , compost plant and other work under sbm 2.0 in shahganj.
Construction of 3 tpd material recovery facility center , compost plant and other work under sbm 2.0 in shahganj.
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreBiennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Read moreSitc of 10000 litres per hour capacity ro plant treated water output capacity 8000 litres per hour and allied equipments including operation and maintenance for 07 years on public private partnership ppp model at nsut east campus
Sitc of 10000 litres per hour capacity ro plant treated water output capacity 8000 litres per hour and allied equipments including operation and maintenance for 07 years on public private partnership ppp model at nsut east campus
Read moreRunning maintenance of rws scheme at amarpur under gomati district tripura/ sh- construction of boundary wall, fitting fixing of tiles, water proofing of sedimentation tank, reservoir, providing and laying of di pipe for sludge disposal etc. at purba
Running maintenance of rws scheme at amarpur under gomati district tripura/ sh- construction of boundary wall, fitting fixing of tiles, water proofing of sedimentation tank, reservoir, providing and laying of di pipe for sludge disposal etc. at purba
Read moreRunning maintenance of rws scheme under ampi r.d. block during the year 2025-26 /sh-maintenance, repairing of pvc pipe including extention of upvc pipeline and reconstruction of masonry chamber etc. at different dtw schemes under dws sub-divsion, amp
Running maintenance of rws scheme under ampi r.d. block during the year 2025-26 /sh-maintenance, repairing of pvc pipe including extention of upvc pipeline and reconstruction of masonry chamber etc. at different dtw schemes under dws sub-divsion, amp
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Read moreof your Industry type