Tender Details

Particulars Details
Title
Cs Of Ae Services For Long Term Rectification Of Mo Rth Identified Blackspots (17 Nos) Removal Of 2 At Grade Junctions And Allied Works On Existing 4/6 Lane Hyderabad Vijayawada Section Of Nh 65 From Km.40.000 To Km.221.500 In Telangana On Epc Mode.
Description
Cs Of Ae Services For Long Term Rectification Of Mo Rth Identified Blackspots (17 Nos) Removal Of 2 At Grade Junctions And Allied Works On Existing 4/6 Lane Hyderabad Vijayawada Section Of Nh 65 From Km.40.000 To Km.221.500 In Telangana On Epc Mode.
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_155247_1
Reference
Number
NHAI/Tech/TS/ 17BS VUPs/AE/2023
Tender Fee 5000
EMD 0
Tender Value 0
Place nhai hq
Link https://etenders.gov.in
Start Date May 25, 2023 23:30
End Date

24/06/2023 ( Expired 691 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.

Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.

Read more
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.

Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise