Tender Details

Particulars Details
Title
Cs Of Ae Services For Long Term Rectification Of Mo Rth Identified Blackspots (17 Nos) Removal Of 2 At Grade Junctions And Allied Works On Existing 4/6 Lane Hyderabad Vijayawada Section Of Nh 65 From Km.40.000 To Km.221.500 In Telangana On Epc Mode.
Description
Cs Of Ae Services For Long Term Rectification Of Mo Rth Identified Blackspots (17 Nos) Removal Of 2 At Grade Junctions And Allied Works On Existing 4/6 Lane Hyderabad Vijayawada Section Of Nh 65 From Km.40.000 To Km.221.500 In Telangana On Epc Mode.
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_155247_1
Reference
Number
NHAI/Tech/TS/ 17BS VUPs/AE/2023
Tender Fee 5000
EMD 0
Tender Value 0
Place nhai hq
Link https://etenders.gov.in
Start Date May 25, 2023 23:30
End Date

24/06/2023 ( Expired 735 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang

Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang

Read more
Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode

Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode

Read more
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Providing of solar/power caution blinkers and illumination by solar/conventional lighting at median opening locations of morth identified blackspots/accident spots of hyderabad-vijayawada section of nh-65 from km.40 to 221.500 in the state of tg, ap.

Providing of solar/power caution blinkers and illumination by solar/conventional lighting at median opening locations of morth identified blackspots/accident spots of hyderabad-vijayawada section of nh-65 from km.40 to 221.500 in the state of tg, ap.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise