Tender Details

Particulars Details
Title
Balance Work Of Subways Work Due To Proposed 3rd Line In Jalgaon Manmad Section In Lieu Of Targeted Level Crossings Of Bhusawal Division. (Project Id 01011516130002)
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73178211
Reference
Number
LCBalancework
Tender Fee 0
EMD 3.34 Lakh
Tender Value
Place Mumbai CST
Link https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73178211/viewNitPdf_4458670.pdf
Start Date January 19, 2024 17:18
End Date

20/02/2024 ( Expired 449 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Read more
Vertical extension of 3rd to 9th floor over the existing three storied academic building in the campus of state aided womens university at diamond harbour, in the district of south 24 parganas -- sitc ac balance work.

Vertical extension of 3rd to 9th floor over the existing three storied academic building in the campus of state aided womens university at diamond harbour, in the district of south 24 parganas -- sitc ac balance work.

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Work of attending to resolving the fuse off call complaints lt/ht line breakdowns for restoration of electrical power supply in the various divisions under city circle amritsar and east division amritsar under suburban circle amritsar

Work of attending to resolving the fuse off call complaints lt/ht line breakdowns for restoration of electrical power supply in the various divisions under city circle amritsar and east division amritsar under suburban circle amritsar

Read more
Work of con of the existing overhead 11kv line of amona feeder from 33/11kv sankhalim sub station to underground in the jurisdiction of sub division-ii( r ), sankhali, division-v bicholim

Work of con of the existing overhead 11kv line of amona feeder from 33/11kv sankhalim sub station to underground in the jurisdiction of sub division-ii( r ), sankhali, division-v bicholim

Read more
Sankrail to manikpur hirapur bazar road from 1.20 km to 1.80 km, emergent temporary restoration work in various stretches for laying of phe pipe line under howrah highway sub-division of howrah highway division

Sankrail to manikpur hirapur bazar road from 1.20 km to 1.80 km, emergent temporary restoration work in various stretches for laying of phe pipe line under howrah highway sub-division of howrah highway division

Read more
Tender for supply of equipment / material , design, erection, testing commissioning for shifting of existing 11 kv ht line, lt line and 100 kva sub-station due to proposed construction of mini sectt. at bharmour chowkon the request of hppwd in sect

Tender for supply of equipment / material , design, erection, testing commissioning for shifting of existing 11 kv ht line, lt line and 100 kva sub-station due to proposed construction of mini sectt. at bharmour chowk on the request of hppwd in sec

Read more
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Read more
Quantum of work involved in maintenance and replacement of 33 kv,11 kv, and l.t. line which are damaged due to accident of vehicle, theft of wire and heavy storm(daiviya aapda)etc in the area of e.d.s.d.-i, purwa and e.d.s.d.-maurwan, unnao

Quantum of work involved in maintenance and replacement of 33 kv,11 kv, and l.t. line which are damaged due to accident of vehicle, theft of wire and heavy storm(daiviya aapda)etc in the area of e.d.s.d.-i, purwa and e.d.s.d.-maurwan, unnao

Read more
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise