Tender Details
Particulars | Details |
---|---|
Title |
Water Proofing , Repair Plaster And Treatment Of Seepage On Roof And Painting Work At International Students House, University Of Delhi
|
Description |
Water Proofing , Repair Plaster And Treatment Of Seepage On Roof And Painting Work At International Students House, University Of Delhi
|
Organisation | Delhi University | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 58461 |
Tender Value | |
Place | North Campus |
Link |
AAAAAAAAAA Login to view |
Start Date | June 03, 2025 23:30 |
End Date |
26/06/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Upgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreSurface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreRectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Read moreSpecial repair for replacement of water treatment plant of capacity 90000 lph against ber at main pump house at comd hosp (ec) under ge(a) kolkata
Special repair for replacement of water treatment plant of capacity 90000 lph against ber at main pump house at comd hosp (ec) under ge(a) kolkata
Read moreWork of repairing, grouting and painting of m.s. angle of cable trenches of 400/220kv switchyard at 400kv sub-station, kashipur
Work of repairing, grouting and painting of m.s. angle of cable trenches of 400/220kv switchyard at 400kv sub-station, kashipur
Read moreWork of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.
Work of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.&#x0d
Read moreCa no.cwe blyge e 09 of 20252026spl repair to bldg no p-151, p-152, p-344 incl water through in a charge and bldg no p-337 water through in b charge at rts and depot hempur under ge (east) bareilly
Ca no.cwe blyge e 09 of 20252026spl repair to bldg no p-151, p-152, p-344 incl water through in a charge and bldg no p-337 water through in b charge at rts and depot hempur under ge (east) bareilly
Read moreof your Industry type