Tender Details

Particulars Details
Title
Construction Of 25cum Cwr With Switch Room With Sanitary And Water Supply Arrangement And Boundary Wall, Pathway, Providing Fhtc And Headwork Pipe Connection Of Cha Sundori Project Of Lankapara Tg Pwss Under Alipurduar Division, Phe Dte.
Description
Construction Of 25cum Cwr With Switch Room With Sanitary And Water Supply Arrangement And Boundary Wall, Pathway, Providing Fhtc And Headwork Pipe Connection Of Cha Sundori Project Of Lankapara Tg Pwss Under Alipurduar Division, Phe Dte.
Organisation PHE | State Govt. and UT
Tender Id 2024_PHED_757208_3
Reference
Number
NIeT NO-17/ALD/2024-2025
Tender Fee 0
EMD 1.15 Lakh
Tender Value
Place ALIPURDUAR
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1673860
Start Date September 25, 2024 22:30
End Date

23/10/2024 ( Expired 206 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
01 of ee/rd/phed of 2025-2026

Balance pipe line for providing functional household tap connection (fhtc), approach road with land development of headwork site, 2nd tubewell site and road restoration of kotgram pwss at raiganj block under raiganj division, phe dte., uttar dinajpur

Read more
Balance work of pipe line with of hdpe pipe with fhtc at pratappur and kalikapur with re connection of existing fhtc and other allied works of augmentation of amlajora pwss (jjm) under rcfa division-i phe dte.

Balance work of pipe line with of hdpe pipe with fhtc at pratappur and kalikapur with re connection of existing fhtc and other allied works of augmentation of amlajora pwss (jjm) under rcfa division-i phe dte.

Read more
Maintenance of pipe line, f.h.t.c and all related structure of standalone piped water supply schemes in jhargram block under jhargram division, phe dte. for 12 months.1)standalone pwss at kismat bagihapa......19)standalone pwss at asanbani.

Maintenance of pipe line, f.h.t.c and all related structure of standalone piped water supply schemes in jhargram block under jhargram division, phe dte. for 12 months.1)standalone pwss at kismat bagihapa......19)standalone pwss at asanbani.

Read more
Laying distribution main pipe line from 2nd pump house to distribution system, repairing of damaged fhtc, construction of valve chembers and its allied works of sasra pwss in gopiballavpur-i block within jhargram district under jhargram division, phe

Laying distribution main pipe line from 2nd pump house to distribution system, repairing of damaged fhtc, construction of valve chembers and its allied works of sasra pwss in gopiballavpur-i block within jhargram district under jhargram division, phe

Read more
Laying of additional di and hdpe pipeline, construction of sluice valve chamber and other works at dimdima (zone-i and ii) pwss under alipurduar division, phe dte.

Laying of additional di and hdpe pipeline, construction of sluice valve chamber and other works at dimdima (zone-i and ii) pwss under alipurduar division, phe dte.

Read more
Construction of fabrication fitting and fixing of sleeper, round dolna, sitting bench , shed with sitting arrangement, repairing of boundary wall ,pathway at kalikinkar park under srirampur gp

Construction of fabrication fitting and fixing of sleeper, round dolna, sitting bench , shed with sitting arrangement, repairing of boundary wall ,pathway at kalikinkar park under srirampur gp

Read more
Special repairing and maintenance of pipe line ,ferrule wash ,valve replacement ,road restoration work with earth work for babla mouza and bainchi havitation of galsi pwss,block-galsi-ii,purba bardhaman under dwsd,phe dte

Special repairing and maintenance of pipe line ,ferrule wash ,valve replacement ,road restoration work with earth work for babla mouza and bainchi havitation of galsi pwss,block-galsi-ii,purba bardhaman under dwsd,phe dte

Read more
Solarization of grid connected pumping installation at different pwss at alipurduar -i and ii block in the dist.of alipurduar under jjm programme under northern mechanical division-ii, phe dte

Solarization of grid connected pumping installation at different pwss at alipurduar -i and ii block in the dist.of alipurduar under jjm programme under northern mechanical division-ii, phe dte

Read more
Gap joint and restoration of hdpe line and repairing of fhtc and allied works at radharani and chuapara village under radharani under bhutri forest pwss within kalchini block under alipurduar division, phe dte.

Gap joint and restoration of hdpe line and repairing of fhtc and allied works at radharani and chuapara village under radharani under bhutri forest pwss within kalchini block under alipurduar division, phe dte.

Read more
Preparation and supply of three dimenstional model of raw water rising main, intake sturcture and other buildings as per design and specification with lighting arrangment complete in all respect as per e.i.c at alipurduar division, phe dte.

Preparation and supply of three dimenstional model of raw water rising main, intake sturcture and other buildings as per design and specification with lighting arrangment complete in all respect as per e.i.c at alipurduar division, phe dte.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise