Tender Details
About Tender
🛣️ Road Maintenance Contract Opportunity With The Pwd (R And B), State Govt. And Ut 🛣️ The Chief Engineer, Pwd (R And B), State Govt. And Ut, Invites Bids For The Maintenance Of A Road Stretch On Nh 08 From Bazar India To Murabari, Totaling 2.10 Km. The Contract Includes Two Distinct Portions: 1. Bazar India To Rail Bridge (Ch 0+00 Km To Ch 1+10 Km, 1.10 Km) 2. Office Tilla Horticulture Godown To Bazar India To Murabari (1.10 Km) 🗓️ Bid Submission Deadline: July 16, 2024, 3:00 Pm Bid Documents Must Be Accompanied By A Tender Fee Of Inr 1000, And Eligible Bidders Will Be Required To Deposit An Earnest Money Deposit (Emd) Of Inr 48,518. Interested Contractors Should Submit Detailed Proposals, Including Method Statements, Work Plans, And Financial Bids, To Address The Maintenance Requirements Of This Road Section. Keywords: Road Maintenance, Pwd (R And B), State Govt. And Ut, Nh 08, Bishalgarh, Tender, Bid, Emd, InfrastructureParticulars | Details |
---|---|
Title |
Maintenance Of Road From Nh 08 At Bazar India To Murabari Length 2 Point 10 Km / Portion From Bazar India To Rail Bridge From Ch 0 Point 00 Km To Ch 1 Point 10 Km Length 1 Point 10 Km And Office Tilla Horticulture Godown To Bazar India To Murabari
|
Description |
Maintenance Of Road From Nh 08 At Bazar India To Murabari Length 2 Point 10 Km / Portion From Bazar India To Rail Bridge From Ch 0 Point 00 Km To Ch 1 Point 10 Km Length 1 Point 10 Km And Office Tilla Horticulture Godown To Bazar India To Murabari
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2024_CEPWD_50024_1 |
Reference Number |
16/R/EE-BSLD/PWDRnB/2024-25 |
Tender Fee | 1000 |
EMD | 48518 |
Tender Value | |
Place | Bishalgarh |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=50876 |
Start Date | June 24, 2024 22:00 |
End Date |
16/07/2024 ( Expired 306 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreMtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Read morePeriodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Periodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Read moreFdr / mtc. of road from natun bazar tehsil office to hanging bridge via madhan mohan ashram at ch. 0.00 km to 0.70 km (l- 700.00 mtr ) under jatanbari pwd(randb) sub-division / sh- throughout re-carpeting (l-0.700 km) , sand seal coating, wbm gr-3
Fdr / mtc. of road from natun bazar tehsil office to hanging bridge via madhan mohan ashram at ch. 0.00 km to 0.70 km (l- 700.00 mtr ) under jatanbari pwd(randb) sub-division / sh- throughout re-carpeting (l-0.700 km) , sand seal coating, wbm gr-3
Read morePerformance based maintenance contract (pbmc) to nh-61(new nh-2) from km 240.000 (assam nagaland border) to km 257.469 (jhanji tiniali) (total length 17.469 km) (job. no. pbmc/02/as/2024-25/280)
Performance based maintenance contract (pbmc) to nh-61(new nh-2) from km 240.000 (assam nagaland border) to km 257.469 (jhanji tiniali) (total length 17.469 km) (job. no. pbmc/02/as/2024-25/280)
Read moreMaintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 0.00 to 1.40 km)/gr-i
Maintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 0.00 to 1.40 km)/gr-i
Read moreMaintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 1.40 km to 2.80 km)/gr-ii
Maintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 1.40 km to 2.80 km)/gr-ii
Read moreMaintenance of road from tula bagan office tilla (old panchapet ) to apu debnath house via sekhar deb and kinkar deb house during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.45 km)
Maintenance of road from tula bagan office tilla (old panchapet ) to apu debnath house via sekhar deb and kinkar deb house during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.45 km)
Read moreMaintenance of road from tula bagan office tilla (house of gopal banik) to bb tilla loknath mandir during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Maintenance of road from tula bagan office tilla (house of gopal banik) to bb tilla loknath mandir during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Read moreof your Industry type