Tender Details
Particulars | Details |
---|---|
Title |
Periodical Repair Of Paingaltu To Sekhsai Mandir Via Khirbi, Banswan Rd 0.00 To 10.08 Km. Under Pmgsy Ii In Palwal Distt. Without Gst Re Tender
|
Description |
Periodical Repair Of Paingaltu To Sekhsai Mandir Via Khirbi, Banswan Rd 0.00 To 10.08 Km. Under Pmgsy Ii In Palwal Distt. Without Gst Re Tender
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_303118_1 |
Reference Number |
2023BCB6CD41 EB8D 4F68 93D8 540DE6EACC5C624BAR |
Tender Fee | 15000 |
EMD | 3.24 Lakh |
Tender Value | |
Place | PD Palwal |
Link | https://etenders.hry.nic.in |
Start Date | August 11, 2023 22:30 |
End Date |
24/08/2023 ( Expired 656 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreRepair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Repair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreNagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreRepair to internal road in zone-iii and adjacent area under age b/r-ii of ge (north) meerut cantt
Repair to internal road in zone-iii and adjacent area under age b/r-ii of ge (north) meerut cantt
Read moreCa no ge(n)amb-16/2025-26 repair to fencing, compound wall, hard standing, drain and other allied works in jcos/ors md accn and other areas of age b/r-ii under ge (north) ambala cantt
Ca no ge(n)amb-16/2025-26 repair to fencing, compound wall, hard standing, drain and other 
 allied works in jcos/ors md accn and other areas of age b/r-ii under ge (north) ambala cantt 
Read moreof your Industry type