Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Universal Reloads For 55 Mm Linerar Cutter Compatible With Ntlc 55 Linear Cutter Compatible With Ntlc 55
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106234068 |
|
Reference Number |
62243636 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/012024/106234068/viewNitPdf_4442593.pdf |
| Start Date | January 02, 2024 22:59 |
| End Date |
Expired
16/01/2024
Expired 913 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Optical power meter with visual fault locator
For complete deion and other details, please refer to tender
Read moreHand brake screw nut with washer to irs rdso drg. no. wa/bg-6346, alt-nil.
For complete deion and other details, please refer to tender
Read moreJp/b862-000-yf-mr-2010/553 - special flow instruments for pdh pp plant with ethane and propane handling facilities project at dahej, gujarat
Jp/b862-000-yf-mr-2010/553 - special flow instruments for pdh pp plant with ethane and propane handling facilities project at dahej, gujarat
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreUniversal reloads for 75 mm linerar cutter -compatible with ntlc 75 linear cutter compatible with ntlc75 - code sr75
For complete deion and other details, please refer to tender
Read moreLinear cutter 55 mm,universal linear cutter cartridge 55 mm,linear cutter 75 mm,universal linear cu
Read more
of your Industry type