Tender Details

Particulars Details
Title
Universal Reloads For 55 Mm Linerar Cutter Compatible With Ntlc 55 Linear Cutter Compatible With Ntlc 55
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106234068
Reference
Number
62243636
Tender Fee 0
EMD 0
Tender Value
Place Mumbai CST
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/012024/106234068/viewNitPdf_4442593.pdf

Start Date January 02, 2024 22:59
End Date
Expired 16/01/2024

Expired 913 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Optical power meter with visual fault locator

For complete deion and other details, please refer to tender

Read more
Hand brake screw nut with washer to irs rdso drg. no. wa/bg-6346, alt-nil.

For complete deion and other details, please refer to tender

Read more
Jp/b862-000-yf-mr-2010/553 - special flow instruments for pdh pp plant with ethane and propane handling facilities project at dahej, gujarat

Jp/b862-000-yf-mr-2010/553 - special flow instruments for pdh pp plant with ethane and propane handling facilities project at dahej, gujarat

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise