Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Handling Work Of Paddy In Bindki Mandi 3 Center Fatehpur
|
Description |
Handling Work Of Paddy.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_DOFCS_824585_73 |
Reference Number |
817/Paddy Handling/19.07.2023 |
Tender Fee | 590 |
EMD | 12000 |
Tender Value | 0 |
Place | RFC OFFICE PRAYAGRAJ |
Link | https://etender.up.nic.in |
Start Date | July 27, 2023 14:30 |
End Date |
10/08/2023 ( Expired 677 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreModification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreHandling and transportation of grains from fci depot to various fps in ajmer distt
Handling and transportation of grains from fci depot to various fps in ajmer distt
Read moreof your Industry type