Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ahp Dn Unit I Ii Iii Removal Of Accumulated Wet Ash
|
| Description |
Ahp Dn Unit I Ii Iii Removal Of Accumulated Wet Ash
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_496009_1 |
|
Reference Number |
CE/NCTPSI/SE/MII/Sp58/2024-25 |
| Tender Fee | 0 |
| EMD | 4100 |
| Tender Value | - |
| Place | work |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=589373 |
| Start Date | October 23, 2024 17:30 |
| End Date |
Expired
29/10/2024
Expired 697 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreAhp removal of accumulated collected ash in newly constructed culvert e of stage iii
Ahp removal of accumulated collected ash in newly constructed culvert e of stage iii and nearby area adjacent of compound wall removal of all jungles scrubs and debris for laying and erection of stage iii ash disposal pipe line inside nctps i prem
Read moreNctps i se m ii circle ahp dn unit iii removal of settled ash clinker in unit iii common trench from bottom ash hopper to ash handling pump house and interconnection tunnel between unit iii ii by hammering during aoh 2024 2025
Nctps i se m ii circle ahp dn unit iii removal of settled ash clinker in unit iii common trench from bottom ash hopper to ash handling pump house and interconnection tunnel between unit iii ii by hammering during aoh 2024 2025
Read moreNctps ii 2x600 mw mi bm division unit i boiler cleaning and removal of accumulated ash
Nctps ii 2x600 mw mi bm division unit i boiler cleaning and removal of accumulated ash
Read moreAhp dn unit i ii iii air pre-heater economizer flue gas duct
Ahp dn unit i ii iii air pre-heater economizer flue gas duct hoppers mixing box accessories and pipe lines attending breakdown works for the period of six months from the date of taking over of site
Read moreAhp dn unit i ii iii manual evacuation of ash and clinkers from the bah trenches by engaging jcb tractors while unit
Ahp dn unit i ii iii manual evacuation of ash and clinkers from the bah trenches by engaging jcb tractors while unit is in maximum generation
Read moreNctps ii 2x600 mw mi circle bm unit i aoh 2024 25 removal of accumulated ash from
Nctps ii 2x600 mw mi circle bm unit i aoh 2024 25 removal of accumulated ash from
Read moreNctps ii mi circle bm division unit i 600mw boiler removal and cleaning of accumulated ash from
Nctps ii mi circle bm division unit i 600mw boiler removal and cleaning of accumulated ash from
Read moreNctps i se mi circle aoh 23 24 bm dn unit i removal of accumulated ash in pent house rear arch
Nctps i se mi circle aoh 23 24 bm dn unit i removal of accumulated ash in pent house rear arch enclosure for cleaning of boiler and erection operation dismantling of sky climbers to assist arc filling in burner panels sadc
Read moreof your Industry type