Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ahp Dn Unit I Ii Iii Removal Of Accumulated Wet Ash
|
| Description |
Ahp Dn Unit I Ii Iii Removal Of Accumulated Wet Ash
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_496009_1 |
|
Reference Number |
CE/NCTPSI/SE/MII/Sp58/2024-25 |
| Tender Fee | 0 |
| EMD | 4100 |
| Tender Value | - |
| Place | work |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=589373 |
| Start Date | October 23, 2024 17:30 |
| End Date |
Expired
29/10/2024
Expired 674 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
It addl. pune infotech park i industrial area. m and r to rgibp industrial area, hinjawadi. annual maintenance of cctv surveillance system network in rgibp phase i, ii and iii.
It addl. pune infotech park i industrial area. m and r to rgibp industrial area, hinjawadi. annual maintenance of cctv surveillance system network in rgibp phase i, ii and iii.
Read moreResurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.
Resurvey of malali rf block i,ii, iii reserved forest, with its boundary length measuring approximately 41.20 km in nagara range, sagara division, during 2026-27.
Read moreDemarcation of surveyed boundary of harkur rf extn block bit i ii iii reserve forest by construction of 18 rcc pillars of specified dimensions at the given locations along the notified forest boundary in kundapura range of kundapura division during 2026-27.
Demarcation of surveyed boundary of harkur rf extn block bit i ii iii reserve forest by construction of 18 rcc pillars of specified dimensions at the given locations along the notified forest boundary in kundapura range of kundapura division during 2026-27.
Read moreResurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreAhp removal of accumulated collected ash in newly constructed culvert e of stage iii
Ahp removal of accumulated collected ash in newly constructed culvert e of stage iii and nearby area adjacent of compound wall removal of all jungles scrubs and debris for laying and erection of stage iii ash disposal pipe line inside nctps i prem
Read moreNctps i se m ii circle ahp dn unit iii removal of settled ash clinker in unit iii common trench from bottom ash hopper to ash handling pump house and interconnection tunnel between unit iii ii by hammering during aoh 2024 2025
Nctps i se m ii circle ahp dn unit iii removal of settled ash clinker in unit iii common trench from bottom ash hopper to ash handling pump house and interconnection tunnel between unit iii ii by hammering during aoh 2024 2025
Read moreNctps ii 2x600 mw mi bm division unit i boiler cleaning and removal of accumulated ash
Nctps ii 2x600 mw mi bm division unit i boiler cleaning and removal of accumulated ash
Read moreAhp dn unit i ii iii air pre-heater economizer flue gas duct
Ahp dn unit i ii iii air pre-heater economizer flue gas duct hoppers mixing box accessories and pipe lines attending breakdown works for the period of six months from the date of taking over of site
Read moreAhp dn unit i ii iii manual evacuation of ash and clinkers from the bah trenches by engaging jcb tractors while unit
Ahp dn unit i ii iii manual evacuation of ash and clinkers from the bah trenches by engaging jcb tractors while unit is in maximum generation
Read moreNctps ii 2x600 mw mi circle bm unit i aoh 2024 25 removal of accumulated ash from
Nctps ii 2x600 mw mi circle bm unit i aoh 2024 25 removal of accumulated ash from
Read moreof your Industry type